|
assembled by or for Contractor and submitted by 50. Unit Price Work--Work to be paid for on
<br /> Contractor to illustrate some portion of the Work. the basis of unit prices.
<br /> 42. Site--Lands or areas indicated in the 51. Work--The entire construction or the
<br /> Contract Documents as being furnished by Owner various separately identifiable parts thereof required
<br /> upon which the Work is to be performed, including to be provided under the Contract Documents. Work
<br /> rights-of-way and easements for access thereto, and includes and is the result of performing or providing
<br /> such other lands furnished by Owner which are all labor, services, and documentation necessary to
<br /> designated for the use of Contractor. produce such construction, and furnishing, installing,
<br /> and incorporating all materials and equipment into
<br /> 43. Specifications—That part of the Contract such construction, all as required by the Contract
<br /> Documents consisting of written requirements for Documents.
<br /> materials, equipment, systems, standards and
<br /> workmanship as applied to the Work, and certain 52. Work Change Directive—A written
<br /> administrative requirements and procedural matters statement to Contractor issued on or after the
<br /> applicable thereto. Effective Date of the Agreement and signed by
<br /> Owner and recommended by Engineer ordering an
<br /> 44. Subcontractor—An individual or entity addition, deletion, or revision in the Work, or
<br /> having a direct contract with Contractor or with any responding to differing or unforeseen subsurface or
<br /> other Subcontractor for the performance of a part of physical conditions under which the Work is to be
<br /> the Work at the Site. performed or to emergencies. A Work Change
<br /> Directive will not change the Contract Price or the
<br /> 45. Substantial Completion--The time at Contract Times but is evidence that the parties
<br /> which the Work (or a specified part thereof) has expect that the change ordered or documented by a
<br /> progressed to the point where, in the opinion of Work Change Directive will be incorporated in a
<br /> Engineer, the Work (or a specified part thereof) is subsequently issued Change Order following
<br /> sufficiently complete, in accordance with the negotiations by the parties as to its effect, if any, on
<br /> Contract Documents, so that the Work (or a the Contract Price or Contract Times.
<br /> specified part thereof) can be utilized for the
<br /> purposes for which it is intended. The terms 1.02 Terminology
<br /> "substantially complete" and "substantially com-
<br /> pleted' as applied to all or part of the Work refer to A. The following words or terms are not
<br /> Substantial Completion thereof. defined but, when used in the Bidding Requirements
<br /> or Contract Documents, have the following meaning.
<br /> 46. Successful Bidder—The Bidder
<br /> submitting a responsive Bid to whom Owner makes B. Intent of Certain Terms or Adjectives
<br /> an award.
<br /> 1. The Contract Documents include the
<br /> 47. Supplementary Conditions--That part of terms "as allowed," "as approved,' 'as ordered°, "as
<br /> the Contract Documents which amends or directed" or terms of like effect or import to authorize
<br /> supplements these General Conditions. an exercise of professional judgment by Engineer. In
<br /> addition, the adjectives "reasonable," "suitable,"
<br /> 48. Supplier—A manufacturer, fabricator, "acceptable," "proper," "satisfactory,' or adjectives of
<br /> supplier, distributor, materialman, or vendor having a like effect or import are used to describe an action or
<br /> direct contract with Contractor or with any Subcon- determination of Engineer as to the Work. It is
<br /> tractor to furnish materials or equipment to be intended that such exercise of professional
<br /> incorporated in the Work by Contractor or any judgment, action or determination will be solely to
<br /> Subcontractor evaluate, in general, the Work for compliance with
<br /> the requirements of and information in the Contract
<br /> 49. Underground Facilities—All underground Documents and conformance with the design
<br /> pipelines, conduits, ducts, cables, wires, manholes, concept of the completed Project as a functioning
<br /> vaults, tanks, tunnels, or other such facilities or whole as shown or indicated in the Contract
<br /> attachments, and any encasements containing such Documents (unless there is a specific statement
<br /> facilities, including those that convey electricity, indicating otherwise). The use of any such term or
<br /> gases, steam, liquid petroleum products, telephone adjective is not intended to and shall not be effective
<br /> or other communications, cable television, water, to assign to Engineer any duty or authority to
<br /> wastewater, storm water, other liquids or chemicals, supervise or direct the performance of the Work or
<br /> or traffic or other control systems. any duty or authority to undertake responsibility
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract
<br /> Copyright 0 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br /> 00700-
<br /> 03/12 11-4179
<br />
|