Laserfiche WebLink
Contractor shall submit to Engineer for timely 2. Contractor's Schedule of Submittals will <br /> review: be acceptable to Engineer if it provides a workable <br /> arrangement for reviewing and processing the <br /> 1. a preliminary Progress Schedule; indicat- required submittals. <br /> ing the times (numbers of days or dates) for starting <br /> and completing the various stages of the Work, 3. Contractor's Schedule of Values will be <br /> including any Milestones specified in the Contract acceptable to Engineer as to form and substance if it <br /> Documents; provides a reasonable allocation of the Contract <br /> Price to component parts of the Work. <br /> 2. a preliminary Schedule of Submittals; and <br /> 3. a preliminary Schedule of Values for all of ARTICLE 3-CONTRACT DOCUMENTS: INTENT, <br /> the Work which includes quantities and prices of AMENDING, REUSE <br /> items which when added together equal the Contract <br /> Price and subdivides the Work into component parts <br /> in sufficient detail to serve as the basis for progress 3.01 Intent <br /> payments during performance of the Work. Such <br /> prices will include an appropriate amount of A. The Contract Documents are comple- <br /> overhead and profit applicable to each item of Work. mentary; what is required by one is as binding as if <br /> required by all. <br /> 2.06 Preconstruction Conference <br /> B. It is the intent of the Contract Documents <br /> A. Before any Work at the Site is started, a to describe a functionally complete Project (or part <br /> conference attended by Owner, Contractor, thereof) to be constructed in accordance with the <br /> Engineer, and others as appropriate will be held to Contract Documents. Any labor, documentation, <br /> establish a working understanding among the services, materials, or equipment that may <br /> parties as to the Work and to discuss the schedules reasonably be inferred from the Contract Documents <br /> referred to in Paragraph 2.05.A, procedures for or from prevailing custom or trade usage as being <br /> handling Shop Drawings and other submittals, required to produce the intended result will be <br /> processing Applications for Payment, and provided whether or not specifically called for at no <br /> maintaining required records additional cost to Owner. <br /> 2.07 Initial Acceptance of Schedules C. Clarifications and interpretations of the <br /> Contract Documents shall be issued by Engineer as <br /> A. At least 10 days before submission of the provided in Article 9. <br /> first Application for Payment a conference attended <br /> by Contractor, Engineer, and others as appropriate 3.02 Reference Standards <br /> will be held to review for acceptability to Engineer as <br /> provided below the schedules submitted in A. Standards, Specifications, Codes, Laws, <br /> accordance with Paragraph 2.05.A. Contractor shall and Regulations <br /> have an additional 10 days to make corrections and <br /> adjustments and to complete and resubmit the 1. Reference to standards, specifications, <br /> schedules. No progress payment shall be made to manuals, or codes of any technical society, <br /> Contractor until acceptable schedules are submitted organization, or association, or to Laws or <br /> to Engineer. Regulations, whether such reference be specific or <br /> by implication, shall mean the standard, <br /> 1. The Progress Schedule will be acceptable specification, manual, code, or Laws or Regulations <br /> to Engineer if it provides an orderly progression of in effect at the time of opening of Bids (or on the <br /> the Work to completion within the Contract Times. Effective Date of the Agreement if there were no <br /> Such acceptance will not impose on Engineer Bids), except as may be otherwise specifically stated <br /> responsibility for the Progress Schedule, for in the Contract Documents. <br /> sequencing, scheduling, or progress of the Work nor <br /> interfere with or relieve Contractor from Contractor's 2. No provision of any such standard, <br /> full responsibility therefor. specification, manual or code, or any instruction of a <br /> Supplier shall be effective to change the duties or <br /> responsibilities of Owner, Contractor, or Engineer, or <br /> any of their subcontractors, consultants, agents, or <br /> employees from those set forth in the Contract <br /> Documents. No such provision or instruction shall be <br /> EJCDC C-700 Standard General Conditions of the Construction Contract <br /> Copyright D 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700-9 <br /> 03/12 11-4179 <br />