My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(12-10-01) Newport Fishing Pier and Restaurant Utilities
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2012 11:09:24 AM
Creation date
10/30/2012 10:30:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Newport Fishing Pier and Restaurant Utilities
Bid No. (xx-xx-xx)
12-10-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Delete the last sentence of Paragraph 6.12. and substitute the following: <br /> "These shall be available to ENGINEER for examination during construction and <br /> shall be delivered "to ENGINEER for OWNER upon Substantial Completion of <br /> the Work." <br /> At the end of Paragraph 6.13.B, add the following sentences: <br /> "The Occupational Safety and Health Administration excavation safety standards, <br /> 29 CFR 1926.650 Subpart P trench safety standards are in effect during the <br /> period of construction of the Project. In compliance with current State of Florida <br /> statutes, the Contractor or subcontractor performing trench excavation work on <br /> the Project shall comply with the applicable trench safety standards." <br /> In the sixth line of Paragraph 6.20.A., change the parenthetical insert to read as follows: <br /> "...(including but not limited to fees and charges of ENGINEER, other engineers, <br /> architects, attorneys and other professionals, particularly including, but not <br /> limited to reasonable ENGINEER's attorney's fees, and court costs)...". <br /> ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION <br /> Change the first sentence of Paragraph 9.01.A. to read as follows: <br /> "If OWNER and ENGINEER agree, ENGINEER will be OWNER's representative <br /> during the construction period." <br /> ARTICLE 10 - CHANGES IN THE WORK; CLAIMS <br /> Add the following: <br /> "10.06. Without invalidating the agreement, Owner may, at any time execute <br /> appropriate Change Orders for additions and/or deletions in the work of up to <br /> 25% of the total contract amount, without a change in the contract unit prices <br /> bid." <br /> ARTICLE 13 -TESTS AND INSPECTIONS; CORRECTION, <br /> REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK <br /> Replace 13.03.8. with: <br /> "All testing shall be paid for by the Contractor." <br /> Add the following sentence to Paragraph 13.07.A.: <br /> "Specific and special warranties specified in the Contract Documents are in <br /> addition to, and not in lieu of, the contractors general warranty. CONTRACTOR <br /> shall not be relieved of general warranty obligations by the specification of <br /> specific products or procedures." <br /> 13.09. In the first sentence of the paragraph OWNER, change the first line from "If Contractor <br /> fails within a reasonable time after written notice of Engineer..." to read: <br /> 08/12 00800-6 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.