My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2682
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 2:54:38 PM
Creation date
5/9/2017 2:53:38 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2682
Date (mm/dd/yyyy)
04/20/2017
Description
Agmt with Safeware, Inc. for Installation of Phase II of the Citywide CCTV System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 9. CHANGE ORDERS <br /> 9.1 Changes in the quantity or character of the Services for the Project which are not properly <br /> the subject of Field Directives shall be authorized only by Change Orders approved in advance and <br /> issued in accordance with the guidelines of the City. <br /> 9.2 All changes to the Services must be pre-approved in writing, in advance, by the City in <br /> accordance with the value of the Change Order or the calculated value of the time extension. In the <br /> event Contractor fails to follow this procedure and performs additional work in connection with the <br /> Services without first obtaining pre-approval in writing by the City, the Contractor shall not be <br /> entitled to any additional monies in connection with the additional work performed. <br /> 9.3 In the event satisfactory adjustment cannot be reached for any item requiring a change in the <br /> Contract Amount, the City reserves the right at its sole option to either terminate the Agreement as <br /> it applies to the items in question and make such arrangements as may be deemed necessary to <br /> complete the disputed work; or may submit the matter in dispute as set forth in the dispute resolution <br /> procedures set forth in this Agreement. <br /> 9.4 On approval of any change increasing the Contract amount, Contractor shall ensure that the <br /> Bonds are increased accordingly. <br /> ARTICLE 10. SCOPE OF SERVICES MODIFICATION PROCEDURES <br /> 10.1 CITY INITIATED MODIFICATIONS <br /> The City will issue a detailed description of proposed changes in the Services that may require an <br /> adjustment(s) to the Contract Amount or Contract Time. If necessary, the description will include <br /> supplemental or revised drawings and specifications. Subsequent to notification of modifications <br /> in the Services by City, Contractor shall submit a quotation estimating cost adjustments to the <br /> Contract Amount and/or the Contract Time necessary to execute the change. Contractor shall <br /> include the following information when responding: <br /> • Include a list of quantities of products required or eliminated and unit costs, with total <br /> amount of purchases and credits to be made. If requested, furnish survey data to <br /> substantiate quantities. <br /> • Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br /> discounts. <br /> • Include costs of labor and supervision directly attributable to the change. <br /> • Include an updated contractor's completion schedule that indicates the effect of the <br /> change, including but not limited to, changes in activity duration, start and finish times, <br /> and activity relationship. Use available total float, if any, before requesting an extension <br /> of the Contract Time. <br /> 10.2 CONTRACTOR INITIATED MODIFICATIONS <br /> If latent or unforeseen conditions require modifications in the contract,the Contractor may propose <br /> changes by submitting a request for a change order to the City. Contractor shall use the change <br /> C5800-1617-058—SAFEWARE. INC. Page 8 of 25 S 11 <br />