My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2685
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 10:42:52 AM
Creation date
5/9/2017 2:58:03 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2685
Date (mm/dd/yyyy)
04/20/2017
Description
1st Amend to Agmt w/Fla. Eng. & Dev. Corp. for Prof. Const. Svcs. of 174th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Time means the time period defined in this Agreement for the Contractor to complete <br /> the Work. <br /> Contractor means the Successful Contractor selected by the City to provide all labor, materials, <br /> equipment and services to complete the Work described in the Contract Documents. <br /> Contractor Project Manager means the person designated by Contractor as its lead <br /> representative to the City. The Contractor Project Manager shall have the authority to obligate and <br /> bind the Contractor and to act on all matters on behalf of Contractor except for revisions to the <br /> Contract Documents and Change Orders. <br /> Construction Change Directive means a written directive to effect changes to the Work, <br /> prepared by and executed by the City. <br /> Cure means the action taken by the Contractor, promptly after receipt of written notice from the <br /> City of a breach of the Agreement, which shall be performed at no cost to the City, to repair, <br /> replace, correct, and/or remedy all material, equipment, or other elements of the Work or the <br /> Agreement affected by such breach, or to otherwise make good and eliminate such breach, <br /> including,without limitation,repairing,replacing or correcting any portion of the Work. <br /> Cure Period means a period of seven(7)days, after receipt of written notice to cure from the City, <br /> in which the Contractor is required to cure deficiencies in the Work or compliance with this <br /> Agreement or the Contract Documents. <br /> Drawings means the graphic and pictorial portions of the Work, which serve to show the <br /> design, location and dimensions of the Work to be performed, including, without limitation, all <br /> notes, schedules and legends on such Drawings. <br /> Field Directive means a written approval for the Contractor to proceed with Work requested by <br /> the City, which is minor in nature and should not involve additional cost. <br /> Final Completion means the date certified by the City Engineer that all documents required <br /> by the Contract Documents have been received by the City Engineer; any other documents <br /> required to be provided by Contractor have been received by City Engineer; and to the best of <br /> City Engineer's knowledge, information and belief the Work defined herein has been fully <br /> completed in accordance with the terms and conditions of the Contract Documents. <br /> Insurance Requirements means the requirements described in this Agreement and the Contract <br /> Documents. <br /> Notice To Proceed means a written letter or directive issued by the City Manager or his designee <br /> directing that the Contractor may begin Work. <br /> Project Manager means an employee or representative of the City assigned to manage and monitor <br /> the Work to be performed under this Agreement. <br /> Project means the N.E. 174th Street Roadway Improvements Project as described in RFP 14- <br /> 11-01. <br /> 2 <br /> S 1 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.