My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2017-2685
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2017
>
Reso 2017-2685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 10:42:52 AM
Creation date
5/9/2017 2:58:03 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2017-2685
Date (mm/dd/yyyy)
04/20/2017
Description
1st Amend to Agmt w/Fla. Eng. & Dev. Corp. for Prof. Const. Svcs. of 174th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Punch List means a compilation of items of Construction Work required to be performed by, or <br /> through the Contractor after the Substantial Completion inspection and prior to Final Completion <br /> and payment. <br /> Request For Information (RFI) means a request from the Contractor seeking an interpretation <br /> or clarification by the City relative to the Agreement and/or the Contract Documents. The RFI, <br /> which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) <br /> requiring clarification or interpretation and why the response is needed. The RFI must set forth the <br /> Contractor's interpretation or understanding of the document(s) in question, along with the <br /> reason for such understanding. <br /> Sub-Contractor(s) means a person or entity other than a materialman or laborer that has a <br /> direct contract with the Contractor to perform or supply any portion of the Work in connection <br /> with this Project. <br /> Substantial Completion means that point at which, as certified in writing by the City Manager or <br /> his designee,the Work is at a level of completion in strict compliance with the Contract Documents <br /> such that the City can enjoy beneficial use or occupancy and can use or operate it in all respects, <br /> for its intended purpose. Partial use or occupancy of the Work shall not result in the Work being <br /> deemed substantially complete, and such partial use or occupancy shall not be evidence of <br /> Substantial Completion <br /> Specifications and Plans as used herein means that portion of the Contract Documents which <br /> are the written requirements for the materials, equipment, systems, standards and workmanship for <br /> completion of the Work. <br /> Time for Completion means the time to complete all Work no later than 261 (two hundred and <br /> sixty one) calendar days from the Commencement Date specified in the Notice to Proceed issued <br /> by the City Manager or his designee. <br /> Work as used herein refers to all services required by the Contract Documents, including all <br /> labor, materials, equipment, supervision and services needed to complete the Work in <br /> accordance with the Contract Documents. <br /> ARTICLE 1. SCOPE OF WORK <br /> Contractor shall provide all labor, materials, equipment, tools, manpower, management, <br /> supervision,and all other necessary goods and services to perform the Work in the manner required <br /> by the Contract Documents. <br /> ARTICLE 2. CONTRACT TIME, TIME FOR COMPLETION AND LIQUIDATED <br /> DAMAGES <br /> 2.1 Time is of the essence in the performance of the Work under this Agreement. The <br /> Commencement Date shall be the date specified in the Notice to Proceed issued by the City <br /> Manager or his designee. Contractor shall perform the Work in accordance with the Contract <br /> 3 <br /> SuB <br />
The URL can be used to link to this page
Your browser does not support the video tag.