Laserfiche WebLink
<br />City of Sunny Isles Beach |Request for Proposal No. 12-05-01 27A <br /> <br />The supplying and placing of this section is separate and unique from the on demand section also <br />listed in this package and the proposal price shown for this section will be considered full and total <br />payment for all normal ongoing operations. For any additional payments under this item, or any <br />other, the service must be specifically requested by the City for a unique and specific task. <br /> <br /> <br />Maintenance: As defined for proposal purposes shall include: Litter, trash, and debris removal <br />and disposal; mowing; edging; hedge trimming; tree trimming; turf <br />maintenance; raking; sweeping; weeding, aerating, weed -eating, herbicide <br />applications including preventive and corrective applications, fertilization, insect <br />control including fire ant control, irrigation system repair and adjustments, Palm <br />maintenance and maintenance of all street and landscape furniture and <br />structures, including graffiti and shopping cart removal and litter pick up and <br />removal <br /> <br />3.9.1 E. PARKS (See section E of the bid form) <br /> <br />The Vendor shall conduct “Maintenance” as defined in this proposal to all City parks on a <br />One day a week cycle (or more as needed (eg. Mowing of Bermuda grass twice a <br />week in the summer)). All the tasks required in the “Maintenance” of the Parks shall be <br />completed in the specific day scheduled. If the task cannot be completed in that day, the <br />vendor shall complete all the remaining tasks on the following day at no additional cost <br />to the City (As approved by the City). The Vendor shall ensure that whenever laying <br />Mulch the ground lighting is not covered. <br /> <br /> <br />E1. thru E15. Please see section 3.9 <br /> <br />E6 In addition to the specification above, E6 shall also include the <br />areas around the parking garage, the area along the pathway to <br />the Lehman Causeway, the areas along the Ocean Reserve <br />Condo and parking garage, and the right-of way along NE 193th <br />Street and those areas adjacent to the right-of-way (i.e. the <br />wall). <br /> <br />E8 In addition to the specification above, E8 shall also include all <br />the landscaping around the Pier Park parking lot, the Pier Park <br />beach access area, and the landscaping around the bathroom <br />structure. <br /> <br />3.9.2 F. RIGHTS-OF-WAY (See section F of the bid form) <br /> <br />The Vendor shall conduct “Maintenance” as defined in this proposal to all City Right-of- <br />Way on a One day a week cycle (or more as needed) and except as noted below. <br />All the tasks required in the “Maintenance” of the Right -of-Way shall be completed in the <br />specific day scheduled. If the task cannot be completed in that day, the vendor shall