My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFI No. 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
RFI No. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 11:22:20 AM
Creation date
5/30/2017 11:21:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />22. Question: Please advise if it is mandatory the site visit prior to submitting its offer. <br /> <br />Answer: Refer to Section 2.13. Failure of a bidder to be in compliance with this requirement of the RFP <br />may result in the City determining the submittal is non‐responsive. <br /> <br />23. Question: It isn't quite clear what area the synthetic turf should cover for the soccer field. Should the <br />turf go to the existing fence line? <br /> <br />Answer: The limit of the synthetic turf is to go to the landscape buffer on the inside of the fence. Trees <br />and shrubs/groundcovers are to remain. <br /> <br />24. Question: Please provide site drainage as‐built for both park locations. <br /> <br />Answer: The City does not have storm drainage as‐built. Additional file documentation is attached <br />hereto. <br /> <br />25. Question: At the Margolis park field there are 6‐7 storm manholes on the playing surface inside of the <br />fence. Please provide the thoughts and intent of the City for these manholes. <br /> <br />Answer: The manholes are to remain. <br /> <br />26. Question: Will the current landscaping inside of the fence at Margolis remain or is it to be removed as <br />part of the project? <br /> <br />Answer: The limit of the synthetic turf is to go to the landscape buffer on the inside of the fence. Trees <br />and shrubs/groundcovers are to remain. <br /> <br />27. Question: What is the intent for the clay separator synthetic turf installation at Pelican if anything? <br /> <br />Answer: The existing clay separator located at the southeast corner of the field is to remain. <br /> <br />28. Question: As there is no pre bid for this project and there is a MANDTORY site inspection: will this site <br />inspection “sign in” be a requisite to provide a proposal for the project? <br /> <br />Answer: Section 2.13 of the RFP details the requirements for the mandatory site visit including the <br />required notification of the City representative. <br /> <br />29. Question: The technical specifications do not specify if there will be a requirement for a geotechnical <br />fabric or an impervious liner to separate the “draining gravel blanket” from the subgrade soils. Please <br />clarify if a geotechnical fabric or impervious liner will be required between the subgrade and the <br />“draining gravel blanket”. <br /> <br />Answer: This is a turnkey project. All required plans that include all necessary materials to obtain all <br />applicable permits are required to be prepared by the bidder including appropriate details for <br />installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.