Laserfiche WebLink
  <br />22. Question: Please advise if it is mandatory the site visit prior to submitting its offer.  <br />  <br />Answer: Refer to Section 2.13.  Failure of a bidder to be in compliance with this requirement of the RFP  <br />may result in the City determining the submittal is non‐responsive.    <br />  <br />23. Question: It isn't quite clear what area the synthetic turf should cover for the soccer field.  Should the  <br />turf go to the existing fence line?  <br />  <br />Answer: The limit of the synthetic turf is to go to the landscape buffer on the inside of the fence.  Trees  <br />and shrubs/groundcovers are to remain.  <br />  <br />24. Question: Please provide site drainage as‐built for both park locations.  <br />  <br />Answer: The City does not have storm drainage as‐built.  Additional file documentation is attached  <br />hereto.    <br />  <br />25. Question: At the Margolis park field there are 6‐7 storm manholes on the playing surface inside of the  <br />fence.  Please provide the thoughts and intent of the City for these manholes.  <br />  <br />Answer: The manholes are to remain.   <br />  <br />26. Question: Will the current landscaping inside of the fence at Margolis remain or is it to be removed as  <br />part of the project?  <br />  <br />Answer: The limit of the synthetic turf is to go to the landscape buffer on the inside of the fence.  Trees  <br />and shrubs/groundcovers are to remain.    <br />  <br />27. Question: What is the intent for the clay separator synthetic turf installation at Pelican if anything?  <br />  <br />Answer: The existing clay separator located at the southeast corner of the field is to remain.   <br />  <br />28. Question: As there is no pre bid for this project and there is a MANDTORY site inspection: will this site  <br />inspection “sign in” be a requisite to provide a proposal for the project?  <br />  <br />Answer:  Section 2.13 of the RFP details the requirements for the mandatory site visit including the  <br />required notification of the City representative.    <br />  <br />29. Question: The technical specifications do not specify if there will be a requirement for a geotechnical  <br />fabric or an impervious liner to separate the “draining gravel blanket” from the subgrade soils.  Please  <br />clarify if a geotechnical fabric or impervious liner will be required between the subgrade and the  <br />“draining gravel blanket”.  <br />  <br />Answer:  This is a turnkey project.  All required plans that include all necessary materials to obtain all  <br />applicable permits are required to be prepared by the bidder including appropriate details for  <br />installation.     <br />