Laserfiche WebLink
(2) years for the warranty to extend it to ten (10) years and will consider the additional warranty period  <br />as an enhancement to the contract.     <br />  <br />15. Question: Could you please advise how many copies need to be submitted along with the original bid  <br />for the above referenced RFP.    <br />  <br />Answer:  Refer to Section 5.  <br />  <br />16. Question: Will the City obtain the South Water Management and DERM permits?  <br />  <br />Answer: No, this is a turnkey project.  The successful bidder is responsible to obtain and pay for any and  <br />all permits.   <br />  <br />17. Question: Under page 19 of the RFP article 3.3.3 “SCHEDULE OF WORK”, it states the parks will be  <br />available from June 17, 2012 through August 16, 2012. Is this the allowed time frame (2 months) to  <br />complete the work and liquidated damages based on this?    <br />  <br />Answer: Liquidated damages will be based upon any calendar days beyond August 16, 2013 that the  <br />fields are not complete and ready to be placed in service.    <br />  <br />18. Question: The attached page 25 from the RFP has a note at the bottom stating “Failure to sign page 27  <br />of Section 4 Bid Submittal will render your bid non‐responsive”.  Section 4 is Evaluation Process, Bid  <br />Submittal is Section 6, and page 28 seems to be the correct page.  Please clarify.  <br />  <br />Answer:  All forms requiring signature must be included in your response.   <br />  <br />19. Question: The bid bond form in the specs; the top of the bid bond says “State of Florida, County of  <br />XXXXX.” Since my company is located in Texas, can I just cross this part out and write “State of Texas,  <br />County of Travis…”?   <br />  <br />Answer: The bonding company must be licensed to conduct work in the State of Florida.   <br />  <br />20. Question: We are requesting a change or clarification for the warranty period that the “10 year” period  <br />is for the material.  The artificial turf typically comes with such a guarantee but 10 years on “labor” is not  <br />industry standard and most sureties will not issue bonds for a period longer than one year.  <br />  <br />Answer: An eight (8) year warranty is the minimum that will be considered responsive to the RFP.   <br />Section 4 addresses the basis by which submittals will be evaluated.  The City prefers the additional two  <br />(2) years for the warranty to extend it to ten (10) years and will consider the additional warranty period  <br />as an enhancement to the contract.     <br />  <br />21. Question: The RFP states that the fiber will be a polyethylene monofilament and a polyethylene  <br />texturized blend.  We are not sure if the preference is for a Monofilament only or a Monofilament and  <br />Slit Film combination fiber.  Can you tell us if there is a preference?   We were not familiar with the  <br />polyethylene texturized blend language.  <br />  <br />Answer: Bidders need to be responsive to the specifications of the RFP.  Refer to Sections 2.14 for  <br />alternate materials.