My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFI No. 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 12-10-03 Artificial Turf for Senator Gwen Margolis and Pelican Community Parks
>
RFI No. 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 11:22:20 AM
Creation date
5/30/2017 11:21:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) years for the warranty to extend it to ten (10) years and will consider the additional warranty period <br />as an enhancement to the contract. <br /> <br />15. Question: Could you please advise how many copies need to be submitted along with the original bid <br />for the above referenced RFP. <br /> <br />Answer: Refer to Section 5. <br /> <br />16. Question: Will the City obtain the South Water Management and DERM permits? <br /> <br />Answer: No, this is a turnkey project. The successful bidder is responsible to obtain and pay for any and <br />all permits. <br /> <br />17. Question: Under page 19 of the RFP article 3.3.3 “SCHEDULE OF WORK”, it states the parks will be <br />available from June 17, 2012 through August 16, 2012. Is this the allowed time frame (2 months) to <br />complete the work and liquidated damages based on this? <br /> <br />Answer: Liquidated damages will be based upon any calendar days beyond August 16, 2013 that the <br />fields are not complete and ready to be placed in service. <br /> <br />18. Question: The attached page 25 from the RFP has a note at the bottom stating “Failure to sign page 27 <br />of Section 4 Bid Submittal will render your bid non‐responsive”. Section 4 is Evaluation Process, Bid <br />Submittal is Section 6, and page 28 seems to be the correct page. Please clarify. <br /> <br />Answer: All forms requiring signature must be included in your response. <br /> <br />19. Question: The bid bond form in the specs; the top of the bid bond says “State of Florida, County of <br />XXXXX.” Since my company is located in Texas, can I just cross this part out and write “State of Texas, <br />County of Travis…”? <br /> <br />Answer: The bonding company must be licensed to conduct work in the State of Florida. <br /> <br />20. Question: We are requesting a change or clarification for the warranty period that the “10 year” period <br />is for the material. The artificial turf typically comes with such a guarantee but 10 years on “labor” is not <br />industry standard and most sureties will not issue bonds for a period longer than one year. <br /> <br />Answer: An eight (8) year warranty is the minimum that will be considered responsive to the RFP. <br />Section 4 addresses the basis by which submittals will be evaluated. The City prefers the additional two <br />(2) years for the warranty to extend it to ten (10) years and will consider the additional warranty period <br />as an enhancement to the contract. <br /> <br />21. Question: The RFP states that the fiber will be a polyethylene monofilament and a polyethylene <br />texturized blend. We are not sure if the preference is for a Monofilament only or a Monofilament and <br />Slit Film combination fiber. Can you tell us if there is a preference? We were not familiar with the <br />polyethylene texturized blend language. <br /> <br />Answer: Bidders need to be responsive to the specifications of the RFP. Refer to Sections 2.14 for <br />alternate materials.
The URL can be used to link to this page
Your browser does not support the video tag.