My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 7
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-04-01 Arlen House Right-of-Way Improvement
>
Add No 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:26:03 PM
Creation date
5/30/2017 2:25:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No. 7 <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br /> <br />to dedicated staging areas. The City accepts no liability for any loss of materials, by <br />theft or otherwise, or for any damage to the stored materials. The site directly abuts a <br />residential community, and as such should be maintained in a clean and orderly manner <br />throughout the entire length of work under this Contract. Contractor shall not dispose <br />of materials of any character, rubbish or equipment, on abutting property or public <br />right-of-way, with or without the consent of the property owners. <br /> <br /> <br />4. Section 2.21 states that the proposer shall obtain and pay for all licenses, permits and inspection <br />fees required for this project. <br />a. It is not clear as to who will be responsible for the cost associated with densities. <br />b. If the proposer is responsible please provide information as to how many densities will <br />be required by the City for sidewalk and footers/wall. <br /> <br />Response: <br />a. All fees associated with this project, including but not limited to densities shall be the <br />sole responsibility of the contractor. Proposer shall also be aware that the execution of <br />a Certified Maintenance of Traffic Plan (MOT) may require off-duty City of Sunny Isles <br />Beach Police Officer(s) and FDOT Certified Flagman/Flagmen, the cost of which will be <br />the sole responsibility of the successful Proposer. <br /> <br />b. The contractor will be required to submit certified copies of density tests prior to <br />concrete/paver placement. All testing shall be completed and meet minimum density <br />requirements on each lift prior to additional backfilling. Horizontal distribution of density <br />testing shall be as follows <br />Subgrade: Tests shall be performed at randomly selected locations within each <br />200-ft interval (max) along the length of the sidewalk for each lift of fill (12” <br />max). <br /> <br />Base: Tests shall be performed at randomly selected locations within each 200- <br />ft interval (max) along the length of the sidewalk for each lift of fill (12” max). <br /> <br />Contractors shall also be required to submit copies of batch tickets for 3000 PSI concrete <br />batch samples. <br /> <br /> <br />5. Section 3.1 paragraph 2 speaks of the removal and reinstallation of existing trash receptacles, <br />bus shelters, and other existing elements. <br />a. Will the City be temporarily storing these elements when removed to perform the <br />improvements? <br />b. It was observed that some of these existing elements are rusting and have some existing <br />damage. What measures will be taken to assure that the selected contractor is not held <br />responsible for the existing damage? <br /> <br />Response: <br /> <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.