Laserfiche WebLink
Addendum No. 7 <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br /> <br /> <br />10. Line Item #21 through 23 appears to be for the proposed striping on the Collins Avenue <br />driveway entrance. The plans illustrate a right hand turn arrow but there is no line item for the <br />arrow. <br /> <br />Response: <br />Line item #21A has been added to the attached bid form (Revised 2014/05/01) to address the <br />turn arrow described above. <br /> <br /> <br />11. There are two line items identified as line item #27. <br /> <br />Response: <br />Noted and revised. Please refer to attached Bid Form. <br /> <br /> <br />12. Line Item #31 does not identify the rebar having to be galvanized and there’s no mention of <br />grouting. This line item also calls for a limestone veneer. On sheet LM-02 of the plans it calls for <br />6”x8” Stone Veneer – Florida Oolite. Can you please provide a picture or an example of the <br />proposed 6”x8” Limestone veneer? <br /> <br />Response: <br />Please refer to Addendums 2 and 3 previously posted to Demand Star with regards to rebar and <br />grout. Bidders are directed to the City’s Intracoastal Park located at 16000, 16050, 16100 and <br />16200 Collins Ave for examples of the proposed columns and cupola. A further clarification – the <br />limestone veneer is not 6” X 8”, but rather, 6” to 8”. <br /> <br /> <br />13. Line Items 32 through 34 <br />a. Does not mention stucco. Shall the price of the stucco be included in these line items? <br />c. The line item also mentions a cast in place cap. Can you please confirm if this is the <br />8”x8” reinforced concrete cap or the 4” decorative concrete cap. <br /> <br />Response: <br />a. The perimeter wall construction includes all the cost to deliver a finished, code compliant <br />product from the foundation to the 4” concrete wall cap. The stucco shall be considered <br />a part of these costs <br />b. The cast in place cap referred to is the 4” concrete wall cap, as depicted on sheets ST-02 <br />LM-03, Detail 8. The cap shall also be considered a part of the wall construction costs. <br /> <br /> <br /> <br /> <br /> <br /> <br />4 <br /> <br />