My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 7
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-04-01 Arlen House Right-of-Way Improvement
>
Add No 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:26:03 PM
Creation date
5/30/2017 2:25:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No. 7 <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br /> <br />14. Sheet CC-01 shows the existing pedestrian gate being removed by the proposer but there was <br />no line item provided for the removal. <br /> <br />Response: <br />Bidders shall refer to FDOT pay item notes/details for all bid items which for which an FDOT Pay <br />Item # is provided. The removal of the existing pedestrian gate shall be considered a part of the <br />clearing and grubbing activities – Bid item #1. <br /> <br /> <br />15. Sheet ST-02 Detail 3 – ST-02 calls for a calls for a 4”x4” concrete reinforced cupolas. Are these <br />meant to be pre-casted or is it the City’s intention to have them formed on site with the oolite <br />and grout? <br /> <br />Response: <br />Construction methodology is at the discretion of the contractor. The final deliverable should be <br />in keeping with the Contract documents and all applicable local, state and federal agency <br />requirements. <br /> <br /> <br />16. Has the City applied for an FDOT permit? <br /> <br />Response: <br />The City has obtained a Landscape Permit from the Florida Department of Transportation for <br />the proposed work within the right-of-way, as depicted on the Contract Documents. A copy of <br />the permit (permit # 2014-L-691-6) has been provided herein for reference. The successful <br />proposer shall be responsible for obtaining all construction permits necessary for execution of <br />the design intent. <br /> <br /> <br />17. Can existing East side drive way be closed during construction? <br /> <br />Response: <br />The existing driveway to Collins Ave serves as a vehicular egress/ingress for residents as well as <br />garbage pick-up for the community. As such, access must be maintained at all times for the <br />duration of the project. <br /> <br /> <br />18. Will City’s Landscape Architect provide acceptance letter of final approval for landscaping? <br /> <br />Response: <br />Final approval of the installed landscaping will be subject to inspections by the City’s Landscape <br />Architect, FDOT, Miami-Dade County RER and the City of Sunny Isles Beach. <br /> <br /> <br /> <br />5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.