My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 7
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-04-01 Arlen House Right-of-Way Improvement
>
Add No 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 2:26:03 PM
Creation date
5/30/2017 2:25:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No. 7 <br />ARLEN HOUSE RIGHT-OF-WAY IMPROVEMENT <br />CITY RFP NO. 14-04-01 <br /> <br /> <br />19. On sheet LM-03 detail 8 & 9, can these be precast and set in mud on top of wall as stated in <br />detail 4 same page? <br /> <br />Response: <br />Exact construction methodology is at the discretion of the Contractor, however, the structural <br />requirements outlined on sheet ST-02 Section 3 must be satisfied. <br /> <br /> <br />20. Please clarify in which line item the cost associated with connecting into the existing irrigation <br />main line/backflow should be allocated or please provide a separate line item. <br /> <br />Response: <br />Exact construction methodology is at the discretion of the Contractor, however, the structural <br />requirements outlined on sheet ST-02 Section 3 must be satisfied, as well as any other <br />requirements outlined by the City Building Department. <br /> <br /> <br />21. How will we handle the replacement of any Collins Avenue Asphalt, curb or gutter required by <br />FDOT? <br /> <br />Response: <br />The current contract documents and FDOT permit assume that the existing curb and gutter will <br />remain in place. If damaged by the contractor during the construction operation, existing curb <br />and gutter shall be replaced by the Contractor at no additional cost to the project. <br /> <br /> <br />22. Line item #29 is requesting a Lump Sum to replace and restore existing electrical within Arlen <br />House impacted by proposed project. Can you please provide plans illustrating existing <br />electrical? <br /> <br />Response: <br />Line item # 29 has been eliminated in lieu of a lump sum (LS) contingency to account for this line <br />item. See contingency item # 87 – Electrical Systems Contingency. Prior to start of work on any <br />contingency related items, the Contractor must submit an itemized breakdown to the City for <br />review and approval. <br /> <br /> <br />23. Line Item #80 is for the replacement and restoration of the existing irrigation within the Arlen <br />House. Can you please provide plans illustrating existing irrigation? <br /> <br />Response: <br />Line item # 80 has been eliminated in lieu of a lump sum (LS) contingency to account for this line <br />item. See contingency item # 86 – Irrigation Systems Contingency. Prior to start of work on any <br />contingency related items, the Contractor must submit an itemized breakdown to the City for <br />review and approval. <br /> <br />6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.