My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(14-06-02) Emergency Debris Clearing and Removal
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2017 10:21:39 AM
Creation date
6/12/2017 10:21:06 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />REVISED FEE SCHEDULE FORM <br />EMERGENCY DEBRIS CLEARING AND REMOVAL OPERATIONS <br />RFP NO. 14-06-02 <br /> <br /> <br />NOTE: Where applicable, all final disposal costs <br />(tipping fees) shall be direct pass through to the <br />City with no markup. All disposal receipts must <br />accompany corresponding load tickets for <br />reimbursement through the invoice process. <br /> <br />ITEM DESCRIPTION <br /> <br />UNITS UNIT <br />PRICE <br />1 <br /> <br />Load Vegetative Debris from Public Rights-of- <br />Way (ROW) and Haul to Debris Management Site <br />(DMS) or Final Disposal Site – 0-15 Miles <br />Cubic <br />Yard <br /> <br />2 Load Vegetative Debris from Public ROW and <br />Haul to DMS or Final Disposal Site – 16-30 Miles <br />Cubic <br />Yard <br /> <br />3 Load Vegetative Debris from Public ROW and <br />Haul to DMS or Final Disposal Site – 31+ Miles <br />Cubic <br />Yard <br /> <br />4 <br /> <br />Load Construction & Demolition Debris (C&D) <br />from Public ROW and Haul to DMS or Final <br />Disposal Site – 0-15 Miles <br />Cubic <br />Yard <br /> <br />5 <br /> <br />Load C&D from Public ROW and Haul to DMS or <br />Final Disposal Site – 16-30 Miles <br />Cubic <br />Yard <br /> <br />6 Load C&D from Public ROW and Haul to DMS or <br />Final Disposal Site – 31+ Miles <br />Cubic <br />Yard <br /> <br />7 <br /> <br />Provide DMS Site Management including <br />Preparation, Management & Segregation of Debris <br />Cubic <br />Yard <br /> <br />8 <br /> <br />Reduce Vegetative Debris by Incineration Cubic <br />Yard <br /> <br />9 Reduce Vegetative Debris by Grinding Cubic <br />Yard <br /> <br />10 <br /> <br />Haul Out Processed Debris to Final Disposal – <br />0-15 Miles <br />Cubic <br />Yard <br /> <br />11 Haul Out Processed Debris to Final Disposal – <br />16-30 Miles <br />Cubic <br />Yard <br /> <br />12 Haul Out Processed Debris to Final Disposal – <br />31+ Miles <br />Cubic <br />Yard <br /> <br />13 <br /> <br />Remove Hazardous Stumps – Greater than 24 <br />inches to 36 inches in diameter <br />Each <br />14 <br /> <br />Remove Hazardous Stumps – Greater than 36 <br />inches to 48 inches in diameter <br />Each <br />15 <br /> <br />Remove Hazardous Stumps – Greater than 48 <br />inches in diameter <br />Each <br />16 Remove Hazardous Leaning Trees – 6 inches to 12 <br />inches in diameter <br />Each <br />17 Remove Hazardous Leaning Trees – Greater than <br />12 inches to 24 inches in diameter <br />Each <br />11
The URL can be used to link to this page
Your browser does not support the video tag.