Laserfiche WebLink
18 Remove Hazardous Leaning Trees – Greater than <br />24 inches to 36 inches in diameter <br />Each <br />19 Remove Hazardous Leaning Trees – Greater than <br />36 inches to 48 inches in diameter <br />Each <br />20 <br /> <br />Remove Hazardous Leaning Trees – Greater than <br />48 inches in diameter <br />Each <br />21 Remove Hazardous Limbs (Hangers) – Greater <br />than 2 inches in diameter <br />Each <br />22 Stump Fill Dirt after Stump Removal Cubic <br />Yard <br /> <br />23 Sand Collection and Screening – Pick-up, screen <br />and return <br />Cubic <br />Yard <br /> <br />24 Vehicle Removal and Haul to DMS or Final <br />Disposal <br />Each <br />25 Vessel Removal (Land) and Haul to DMS or Final <br />Disposal <br />LF <br />26 Vessel Removal (Water) and Haul to DMS or Final <br />Disposal <br />LF <br />27 Removal of White Goods from Public ROW and <br />Haul to DMS or Final Disposal <br />Each <br />28 Freon Management and Recycling Each <br />29 <br /> <br />Electronic Waste Removal and Haul to DMS or <br />Final Disposal <br />Each <br />30 <br /> <br />Removal of Household Hazardous Waste (HHW) <br />from Public ROW and Haul to DMS or Final <br />Disposal <br />Pound <br />12