Laserfiche WebLink
Addendum No. 3 - Bidder Questions and Responses <br /> NEW HVAC CHILLER SYSTEM FOR GOVERNMENT CENTER <br />CITY RFP NO. 16-09-02 <br /> <br /> <br /> <br />3 <br /> <br /> <br /> Clarifications: <br /> <br />1. The roof of the government center is home to a large amount of equipment which is <br />currently mounted to the building parapet. Please be advised that the existing equipment <br />CANNOT be removed or relocated at any time during the construction. Bidders are <br />advised to carefully consider their means, methods and crane placement to avoid impact <br />to this critical infrastructure. Any damage to the existing equipment or structure during <br />construction will be the sole responsibility of the contractor. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Government Center <br /> Roof Level <br /> <br /> <br /> <br />