Laserfiche WebLink
wiring, connectors and camera. Programming and new cameras, wiring or <br />connectors, if any to be provided by the CSIB. <br /> <br /> NTE 2 locations in area outside the library and commission chambers <br />11 Base bid Commission Chambers <br />Repair/reinstall acoustic panels and finishes inside commission chambers <br />below 8 feet in height and above the floor including various sound insulating <br />panels and decorative wood finishes, molding etc. Labor only, reuse existing <br />material. Includes minor spot touch up and patching, painting and <br />refinishing, reattachment of various wall panel areas NTE 100 sf <br />included <br />12 Base Bid Remove and replace 3 wall pac light fixtures and 3 exit light fixtures with <br />new or equivalent to match existing NTE 6 total locations combined <br />included <br />13 Base bid Remove and Replace existing emergency/Standby Generator <br /> <br />Contractor shall provide 1 new generator to top deck of parking garage <br />north side of 4th floor and disconnect and move existing generator and <br />external radiator to City garage first floor for storage on blocks, covered <br />with a secured tarp: <br /> <br />New 500 KW or equivalent diesel generator to replace existing Emergency <br />/standby Generator currently housed in first floor generator room, NTE <br />existing load. New generator shall be in a sound attenuated, aluminum UL <br />listed marine enclosure capable of withstanding rooftop exposure, with <br />integral radiator and muffler. Generator shall be wired into existing <br />Emergency circuits and must meet the existing electrical loads and <br />characteristics of the system it replaces. <br /> <br /> Perkins or equivalent. <br />The generator shall be fueled from existing site tank by means of a new <br />pump and piping extending the existing point of connection in or near the <br />generator room. Wiring switch gear and conduit, labor, piping required to <br />install and connect new generator to the first floor equipment locations shall <br />be included. <br /> It is expected that no new conduit or wiring is required from the existing <br />generator in the old generator room to the loads. <br />Exterior Switch gear, junction boxes and devices, conduit, piping required <br />for proper connection must meet roof top exposure requirements, including <br />NEMA III as may be necessary. <br />System must be added to lightning protect loop <br />Generator shall be equipped with a double walled steel base tank capable of <br />8 hours minimum continuous operation on diesel fuel. Entire system must <br />be connected to existing main storage tank through existing plumbing in the <br />current emergency generator room. All controls, switches, valves, pumps <br />must be installed to provide the same operation and intent of the existing <br />day tank and system configuration as shown in attached diagram. <br />Work will include tie downs, and generator and associated equipment and <br />shall be installed on a level Aluminum frame or suitable slab capable of <br />included