Laserfiche WebLink
3.06 RECORD DRAWINGS <br /> <br />A. The CONTRACTOR will prepare a set of record drawings for the project <br />which will include the changes made in materials, equipment locations, <br />and dimensions of the work. <br /> <br />1. Each month, or as otherwise agreed, submit to the OWNER and <br />ENGINEER a current listing and description of each change <br />incorporated into the work since the preceding submittal. <br /> <br />2. At the end of the project, submit to the OWNER and ENGINEER each <br />as the reuired as-built information per section 01785 as required in <br />Project Closeout - Division 1. <br /> <br /> <br />END OF SECTION <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01330 - 5 Submittal Procedures <br />14-1758 / 09-19-2014 <br />