My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Vacant space 6 inches by 4 inches shall be provided to receive the <br />ENGINEERs review stamp. <br /> <br />2. Catalog data ("cut sheets") <br /> <br />a. Each separate catalog, brochure, or single page submitted shall have the <br />identification required hereinbefore. <br /> <br />b. Catalogs or brochures submitted containing multiple items for approval <br />need the identification only on the exterior. <br /> <br />4) In this instances the identification shall include page and catalog item <br />numbers. <br /> <br />D. CONTRACTOR's Responsibility <br /> <br />1. Submittal of shop drawing or catalog data, bearing the CONTRACTOR’s <br />approval stamp, represents that the CONTRACTOR has determined and <br />verified field measurements, field construction criteria, materials, <br />dimensions, catalog numbers and similar data, or will do so, and that he has <br />checked and coordinated each item with other applicable approved shop <br />drawings and the contract requirements. <br /> <br />a. Shop drawings and catalog data submitted without the CONTRACTOR's <br />stamp of approval will be returned to the CONTRACTOR without review. <br /> <br />2. Approval of shop drawings, samples, or catalog data by the ENGINEER <br />shall not authorize deviation from the requirement of the Contract <br />Documents nor shall this approval relieve the CONTRACTOR from <br />responsibility for errors or omissions therein. <br /> <br />E. Shop Drawing Review <br /> <br />1. The ENGINEER shall have ten (10) working days to review shop <br />drawings. <br /> <br />a. In this case, working days shall be defined as days in which the <br />ENGINEER's office is open for regular business. <br /> <br />3.05 FINAL SHOP DRAWINGS TO BE SUBMITTED TO OWNER <br /> <br />A. Complete sets of reproducible final shop drawings shall be submitted to the <br />ENGINEER before, or at the time of, delivery of equipment to the site. <br /> <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01330 - 4 Submittal Procedures <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.