Laserfiche WebLink
e. Date of Resubmittal and Return (as applicable). <br /> <br />f. Date material released (for fabrication). <br /> <br />g. Projected date of fabrication. <br /> <br />h. Projected date of delivery to site. <br /> <br />i. Status of O & M submittal. <br /> <br />F. Designate in the construction schedule, or in a separate coordinated schedule, <br />the dates for submission and the dates that reviewed shop drawings, Working <br />Drawings and Samples will be needed. <br /> <br />1.02 RELATED SECTIONS <br /> <br />1. Standard General Conditions of the Construction Contract - Division 0. <br /> <br />2. Scheduling of Construction - Division 1. <br /> <br />3. Material and Equipment - Division 1. <br /> <br />4. Project Record Documents - Division 1. <br /> <br />5. Operating and Maintenance Data - Division 1. <br /> <br />1.03 CONTRACTOR'S RESPONSIBILITY <br /> <br />A. Check drawings, data and samples prepared by or for him before submitting <br />them to the ENGINEER for review. <br /> <br />1. The drawings and data sheets shall bear CONTRACTOR's stamp. <br /> <br />a. The CONTRACTORs un-stamped or improperly stamped drawings and <br />data sheets will be returned to the CONTRACTOR for conformance with <br />this requirement. <br /> <br />2. Shop drawings shall indicate deviations in the submittal from requirements <br />of the Contract Documents. <br /> <br />B. Determine and verify: <br /> <br />1. Field measurements <br /> <br />2. Field construction criteria <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01334 - 2 Shop Drawings, Product Data, <br />and Samples <br />14-1758 / 09-19-2014 <br />