Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />1.05 SHOP DRAWINGS <br /> <br />A. When used in the Contract Documents, the term "shop drawings" shall be <br />considered to mean CONTRACTOR's plans for material and equipment which <br />become an integral part of the Project. <br /> <br />1. These drawings shall be complete and detailed. <br /> <br />2. Shop drawings shall consist of fabrication, erection and setting drawings <br />and schedule drawings, manufacturer's scale drawings, and wiring and <br />control diagrams. <br /> <br />3. Cuts, catalogs, pamphlets, descriptive literature, and performance and test <br />data, shall be considered only as supportive to required Shop. <br /> <br />B. Drawings and schedules shall be checked and coordinated with work of trades <br />involved, before they are submitted for review by the ENGINEER and shall <br />bear the CONTRACTOR's stamp of approval as evidence of such checking <br />and coordination. <br /> <br />1. Drawings or schedules submitted without this stamp of approval shall be <br />returned to the CONTRACTOR for resubmission. <br /> <br />C. Each shop drawing, shall have a blank area 4 inches by 4 inches, located <br />adjacent to the title block. <br /> <br />1. The title block shall display the following: <br /> <br />a. Number and title of the drawing. <br /> <br />b. Date of drawing or revision. <br /> <br />c. Name of project building or facility. <br /> <br />d. Name of CONTRACTOR and subcontractor submitting drawing. <br /> <br />e. Clear identification of contents and location of work. <br /> <br />f. Specification title and number. <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01334 - 5 Shop Drawings, Product Data, <br />and Samples <br />14-1758 / 09-19-2014 <br />