My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. A minimum of two samples of each item shall be submitted. <br /> <br />C. Each sample shall have a label indicating: <br /> <br />1. Name of Project <br /> <br />2. Name of CONTRACTOR and Subcontractor <br /> <br />3. Material or Equipment Represented <br /> <br />4. Place of Origin <br /> <br />5. Name of Producer and Brand (if any) <br /> <br />6. Location in Project <br /> <br />7. Samples of finished materials shall have additional marking that will identify <br />them under the finished schedules. <br /> <br />D. Prepare a transmittal letter in triplicate for each shipment of samples. <br /> <br />1. Enclose a copy of the transmittal letter with the shipment and send a copy <br />of this letter to the OWNER and ENGINEER. <br /> <br />2. Approval of a sample shall be only for the characteristics or use named in <br />such approval and shall not be construed to change or modify Contract <br />requirements. <br /> <br />E. Approved samples not destroyed in testing shall be sent to the ENGINEER or <br />stored at the site of the work. <br /> <br />1. Approved samples of the hardware in good condition will be marked for <br />identification and may be used in the work. <br /> <br />2. Materials and equipment incorporated in work shall match the approved <br />samples. <br /> <br />3. Samples which failed testing or were not approved samples will be returned <br />to the CONTRACTOR at his expense, if so requested at time of <br />submission. <br /> <br /> <br />PART 2 PRODUCTS (Not Used) <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01334 - 8 Shop Drawings, Product Data, <br />and Samples <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.