Laserfiche WebLink
B. Secure and deliver to the laboratory adequate quantities of representational <br />samples of materials proposed to be used and which require testing. <br /> <br />C. Provide to the laboratory the preliminary design mix proposed to be used for <br />concrete, and other materials mixes which require control by the testing <br />laboratory. <br /> <br />D. Materials and equipment used in the performance of work under this Contract <br />are subject to inspection and testing at the point of manufacture or fabrication. <br /> <br />1. Standard specifications for quality and workmanship are indicated in the <br />Contract Documents. <br /> <br />2. The ENGINEER may require the CONTRACTOR to provide statements or <br />certificates from the manufacturers and fabricators that the materials and <br />equipment provided by them are manufactured or fabricated in full <br />accordance with the standard specifications for quality and workmanship <br />indicated in the CONTRACTOR Documents. <br /> <br />3. Costs of this testing and providing statements and certificates shall be a <br />subsidiary obligation of the CONTRACTOR, and no extra charge to the <br />OWNER shall be allowed on account of such testing and certification. <br /> <br />E. Furnish incidental labor and facilities: <br /> <br />1. To provide access to Work to be tested <br /> <br />2. To obtain and handle samples at the Project site or at the source of the <br />product to be tested <br /> <br />3. To facilitate inspections and tests <br /> <br />4. For storage and curing of test samples <br /> <br />F. Notify laboratory sufficiently in advance of operations to allow for laboratory <br />assignment of personnel and scheduling of tests. <br /> <br />1. When tests or inspections cannot be performed after such notice, the <br />CONTRACTOR shall reimburse the laboratory personnel for travel time <br />incurred due to the CONTRACTOR’s negligence. <br /> <br />G. Employ and pay for the services of a qualified independent testing laboratory to <br />perform inspections, sampling, and testing required. <br /> <br />PART 2 PRODUCTS (Not Used) <br />PART 3 EXECUTION (Not Used) <br />END OF SECTION <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01458 - 2 Testing and Testing <br />Laboratory Services <br />14-1758 / 09-19-2014 <br />