My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Operating & Maintenance Data - Division 1 <br /> <br />G. Warranties and Bonds - Division 1 <br /> <br />H. Installation - Division 1 <br /> <br />I. Product Delivery Requirements - Division 1 <br /> <br />J. Product Storage and Handling - Division 1 <br /> <br />K. Product Substitution Requirements - Division 1 <br /> <br />1.03 APPROVAL OF MATERIALS <br /> <br />A. Only new materials and equipment shall be incorporated in the work. <br /> <br />1. Materials and equipment furnished are subject to the inspection and <br />approval of the ENGINEER. <br /> <br />2. No material shall be delivered to the work without prior approval of the <br />ENGINEER. <br /> <br />B. Within 30 days after the effective date of the Agreement, submit to the <br />ENGINEER, data relating to materials and equipment he proposes to <br />furnish for the work. <br /> <br />1. Data shall be in sufficient detail to enable the ENGINEER to identify the <br />particular product and to form an opinion as to its conformity to the <br />specifications. <br /> <br />2. The data shall comply with product submittals. <br /> <br />C. Furnish facilities and labor for handling and inspection of materials and <br />equipment. <br /> <br />1. Prior to beginning or during progress of the work, submit samples of <br />materials for such special tests as required by the ENGINEER to <br />demonstrate that they conform to the specifications. <br /> <br />2. Samples shall be furnished, stored, packed, and shipped as directed at the <br />CONTRACTOR's expense. <br /> <br />3. Except as otherwise noted, the OWNER will make arrangements for and <br />pay for the tests. <br /> <br />D. Submit data and samples sufficiently early to permit consideration and approval <br />before materials are necessary for incorporation in the work. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01610 - 2 Basic Product Requirements <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.