My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Delay of approval resulting from the CONTRACTOR's failure to submit <br />samples or data promptly shall not be used as a basis of claim against the <br />OWNER or the ENGINEER. <br /> <br />E. Provide samples of workmanship or finish as may be required. <br /> <br />F. The materials and equipment used on the work shall correspond to the <br />approved samples or other data. <br /> <br />1.04 MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br /> <br />A. Provide manufacturer's printed instruction, obtain and distribute copies of such <br />instructions to parties involved in the installation, including copies to the <br />ENGINEER. <br /> <br />1. Maintain one set of complete instructions at the job site during installation <br />and until completion. <br /> <br />B. Handle, install, connect, clean, condition, and adjust products in strict accord <br />with such instructions and in conformity with specified requirements. <br /> <br />1. Should job conditions or specified requirements conflict with manufacturer's <br />instructions, consult with ENGINEER for further instructions. <br /> <br />2. Do not proceed with work without clear instructions. <br /> <br />C. Perform work in accord with manufacturer's instructions. <br /> <br />1. Do not omit preparatory step or installation procedure unless specifically <br />modified or exempted by Contract Documents. <br /> <br />1.05 TRANSPORTATION AND HANDLING <br /> <br />A. Arrange deliveries of products in accord with construction schedules, coordinate <br />to avoid conflict with work and conditions at the site. <br /> <br />B. Deliver products in undamaged condition, in manufacturer's original containers <br />or packaging, with identifying labels intact and legible. <br /> <br />1. Immediately on delivery, inspect shipments to assure compliance with <br />requirements of Contract Documents and approved submittals, and that <br />products are properly protected and Undamaged. <br /> <br />C. Provide equipment and personnel to handle products by methods to prevent <br />soiling or damage to products or packaging. <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01610 - 3 Basic Product Requirements <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.