My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The application shall also contain a statement that the CONTRACTOR <br />agrees to pay direct and indirect costs, resulting from acceptance of the <br />substitute, including redesign and claims of other CONTRACTORs affected <br />by the resulting change. <br /> <br />2. The ENGINEER may require additional data, at the CONTRACTOR's <br />expense for proper evaluation of the proposed substitute. <br /> <br />C. The ENGINEER will be allowed reasonable time for the evaluation of proposed <br />substitution and the Engineer's decision regarding acceptability will be final. <br /> <br />1. No substitute shall be ordered or installed prior to the Engineer's written <br />acceptance. <br /> <br />D. The OWNER may require the CONTRACTOR, at the CONTRACTOR's <br />expense, to supply a specific performance guarantee or other surety covering <br />the substitution. <br /> <br /> E. The ENGINEER will record time required by the ENGINEER or required <br />Consultants in evaluating proposed substitutes by the CONTRACTOR as well <br />as costs required for modification of the Contract Documents as a result thereof. <br /> <br />1. Reimburse the OWNER for costs of ENGINEER services associated with <br />evaluating proposed substitute that does not meet the requirements of the <br />Contract Documents. <br /> <br /> <br />PART 2 PRODUCTS (Not Used) <br /> <br /> <br />PART 3 EXECUTION <br /> <br />3.01 SUBSTITUTIONS <br /> <br />A. Submit requests for substitution in writing, to the ENGINEER for review, <br />and within thirty (30) days from the date of issue of the contract Notice To <br />Proceed. <br /> <br />1. Requests submitted after the specified period may be rejected, at the <br />Engineer's option, without review. <br /> <br />B. Each request for substitution shall be submitted separately in five (5) copies and <br />shall contain complete data substantiating compliance of the proposed <br />substitution with the Contract Documents. <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01630 - 2 Product Substitution Procedures <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.