My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Stationing starts at 0+00 at permanent reference point (i.e. CL, SL etc.) and <br />to run continuously to the project limits <br />• Easements, if any, tied to permanent reference point <br />• Where the proposed improvements cross underground utilities, provide the <br />station, top of pipe/duct elevation, utility material and clearance from bottom <br />of wall <br />• If existing grade elevations are altered within project limits, the contractor <br />shall provide top of ground spot elevations every at every 10’ station <br />• If existing utility rim or structure elevations are altered, identify utility and <br />provide rim elevation and station <br />• The Contractor shall also provide electronic as-builts delivered in AutoCAD <br />2014 <br />• The drawing file is to be in model space utilizing the NAD83/Florida State <br />Planes, East Zone,(ft US) <br />• The drawing shall be layered in accordance with National CAD standards <br />(NCS) <br />• Separate layer names should be used for all distinct objects surveyed. Do <br />not group dis-similar items together on the same layer. For example, do not <br />place line work and annotation on the same layer. <br />• All properties of the AutoCAD entities in the drawing are to be BYLAYER <br />(Absolutely No Exceptions Here). In other words do not change the <br />properties of individual entities. For example, do not place wall items on the <br />electrical layer and just change the color, linetype, or lineweight of the <br />entity. Any user defined blocks used in the drawing shall have all entities <br />created on layer 0, and all other properties shall be set to BYLAYER. <br /> <br /> <br />D. Submittal of as-built drawings shall be in accordance with Division 1. <br /> <br />PART 2 PRODUCTS (Not Used) <br /> <br />PART 3 EXECUTION (Not Used) <br /> <br />END OF SECTION <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01785 - 4 Project Record Documents <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.