Laserfiche WebLink
D. Submit six copies of addendum to the operation and maintenance manuals as <br />applicable and certificates as specified in Division 1 within 30 days after final <br />inspection and plant start-up test. <br /> <br />E. Final Operation and Maintenance submittals shall be in large three ring binders <br />organized by specification Section and plainly marked. <br /> <br />1.09 INSTRUCTION OF OWNER'S PERSONNEL <br /> <br />A. Prior to final inspection or acceptance, fully instruct OWNER's designated <br />operating and maintenance personnel in operation, adjustment and <br />maintenance of products, equipment and systems. <br /> <br />B. Operating and maintenance manual shall constitute the basis of instruction. <br /> <br />1. Review contents of manual with personnel in full detail to explain all aspects <br />of operations and maintenance. <br /> <br />1.10 ENGINEER'S O & M CHECKLIST <br /> <br />A. The ENGINEER will review Operation and Maintenance Manuals submittals on <br />operating equipment for conformance with the requirements of this Section. <br /> <br />1. The review will generally be based upon the checklist presented on the <br />following pages (Form 01780) for the benefit of the CONTRACTOR and his <br />suppliers. <br /> <br /> <br />PART 2 PRODUCTS (Not Used) <br /> <br /> <br />PART 3 EXECUTION (Not Used) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01787 - 8 Operation and Maintenance Data <br />14-1758 / 09-19-2014 <br />