Laserfiche WebLink
SECTION 02200 <br /> <br />SITE PREPARATION <br /> <br />PART 1 GENERAL <br /> <br />1.01 SUMMARY <br /> <br />A. Provide equipment, materials, and labor and performing functions necessary to <br />move personnel and equipment on site, set up offices, trailers, facilities, <br />construction utilities, obtain permits, and prepare the sites for construction. <br /> <br />B. Remove personnel, equipment, temporary facilities, and provide final clean up <br />of the sites when construction is complete. <br /> <br />1.02 WORK SPECIFIED ELSEWHERE <br /> <br />A. Contract Documents <br /> <br />B. General Requirements - Division 1 <br /> <br />C. Temporary Utilities - Division 1 <br /> <br />D. Earthwork - Division 2 <br /> <br />E. Bituminous Concrete Pavement - Division 2 <br /> <br />F. Clearing and Grubbing - Division 2 <br /> <br />G. Construction Facilities - Division 1 <br /> <br /> <br />PART 2 PRODUCTS <br /> <br />2.01 TEMPORARY FACILITIES <br /> <br />A. Provide temporary facilities required for performing the work. <br /> <br />2.02 PARKING FACILITIES <br /> <br />A. Provide parking facilities for personnel working on the project. <br /> <br />1. No employee or equipment parking will be permitted on the OWNER's <br />property except as specifically designated for CONTRACTOR's use. <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02200 - 1 Site Preparation <br />14-1758 / 09-19-2014 <br />