My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02300 <br /> <br />EARTHWORK <br /> <br /> <br />PART 1 GENERAL <br /> <br />1.01 SUMMARY <br /> <br />A. Furnish equipment, materials, and labor and performing functions required for <br />earthwork as specified in the Drawings and Specifications as well as <br />unspecified earthwork necessary to complete the work as specified, including <br />demucking, excavating, filling, grading, compaction, and disposal of excess <br />material. <br /> <br />B. Any list of equipment and/or materials set forth in this section shall not be taken <br />to exclude other incidentals necessary to complete the work in accordance with <br />the Drawings and Specifications for the intended use. <br /> <br />1.02 RELATED SECTIONS <br /> <br />A. General Conditions - Bidding and Contract Requirement <br /> <br />B. General Requirements - Division 1 <br /> <br />C. Site Conditions - Division 1 <br /> <br />D. Payment Procedures - Division 1 <br /> <br />E. Site Preparation - Division 2 <br /> <br />F. Pipe and Tubes - Division 2 <br /> <br />1.03 STANDARDS AND REGULATIONS <br /> <br />A. Florida Department of Transportation - Standard Specifications for Road and <br />Bridge Construction - Latest Edition. <br /> <br />B. American Association of State Highway and Transportation Officials (AASHTO). <br /> <br />1.04 SUBMITTALS <br /> <br />A. Submit a schedule of earthwork activities together with an estimated list of <br />equipment to be used. <br /> <br />B. The schedule shall be subject to approval by the ENGINEER and shall be <br />updated periodically as requested by the ENGINEER. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02300 - 1 Earthwork <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.