My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />B. Structural Fill: <br /> <br />1. Structural fill material shall be a well graded, suitable soil material consisting <br />of a minimum of 60 percent clean medium fine grain sized quartz sand, free <br />of organic, deleterious and/or compressible percent clean medium fine grain <br />sized quartz sand, free of organic, deleterious and/or compressed material. <br /> <br />2. Rock in excess of 1-inch in diameter shall not be used in the fill material. <br /> <br />3. Structural fill shall not contain hardpan, stones, rocks, cobbles, or other <br />similar materials. <br /> <br />C. Common Fill: <br /> <br />1. Common fill material shall be satisfactory soil material containing no more <br />than 20 percent by weight finer than No. 200 mesh sieve. <br /> <br />2. It shall be free from organic matter, muck, marl, and rock exceeding 2 1/2- <br />inches in diameter. <br /> <br />3. Common fill shall not contain broken concrete, masonry, rubble or other <br />similar materials. <br /> <br />4. Materials falling within the above Specifications, encountered during the <br />excavation, may be stored in segregated stockpiles for reuse. <br /> <br />5. Material which, in the opinion of the ENGINEER, is not suitable for reuse <br />shall be spoiled as specified herein for disposal of unsuitable materials by <br />the CONTRACTOR. <br /> <br />D. Rock Bedding: <br /> <br />1. Rock bedding shall be 3/8-inch to 3/4-inch washed and graded limerock. <br /> <br />2. This rock shall be graded so that 99 percent will pass a 3/4-inch screen and <br />80 percent will be retained on a No. 8 screen. <br /> <br />3. Material meeting the Florida Department of Transportation Standard <br />Specification for No. 57 stone shall be acceptable. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02315 - <br />4 <br />Excavation and Fill <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.