My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Requirements for all Excavation: Foundation pits shall be excavated to permit <br />the placing of the full widths and lengths of footings shown in the plans with full <br />horizontal beds. Corners or edges of footings shall not be rounded or <br />undercut. All excavation shall be carried to foundation materials satisfactory to <br />the ENGINEER regardless of the elevation shown on the plans. Unless a firm <br />footing can be established on solid rock before such depths is reached, it shall <br />be carried to such additional depth as may be necessary to eliminate any <br />danger of undermining. Wherever rock bottom is secured, the excavation <br />shall be done in such manner as to allow the solid rock to be exposed and <br />prepared in horizontal beds for receiving the masonry. All loose and <br />disintegrated rock or thin strata shall be removed. All foundation excavations <br />shall be inspected and approved by the ENGINEER prior to the placing of <br />masonry. <br /> <br />B. Earth Excavation - Foundation Material other than Rock: <br /> <br />1. When masonry is to rest on an excavated surface other than rock, special <br />care shall be taken to avoid disturbing the bottom of the excavation, and the <br />final removal of the foundation material to grade shall not be made until just <br />before the masonry is to be placed. In case the foundation material is soft <br />or mucky the ENGINEER may require the CONTRACTOR to excavate to a <br />greater depth and to backfill to grade with approved material. <br /> <br />C. Removal of Obstructions: <br /> <br />1. The CONTRACTOR shall perform all excavation of whatever substances <br />encountered to the depths indicated on the drawings or as necessary. <br />Excavation shall be unclassified regardless of material encountered. This <br />shall include necessary clearing and grubbing of any foreign substance <br />encountered within the structure or trench area. <br /> <br />2. Boulders, logs, or any unforeseen obstacles encountered in excavating <br />shall be removed and no additional compensation will be allowed because <br />of difficulties met in driving through or removing such obstructions. <br /> <br />3. No separate payment for excavation as such will be made. The cost <br />thereof shall be included in the prices for the pipe installation. Excavation <br />material suitable for backfill shall be piled in an orderly manner at a <br />sufficient distance from the trench to avoid overloading and to prevent <br />slides or cave-ins. <br /> <br />D. Rock Excavation: <br /> <br />1. All rock and other hard foundation material shall be freed of all loose <br />material, cleaned, and cut to a firm surface; either level, stepped vertically <br />and horizontally, or serrated, as may be directed by the ENGINEER. All <br />seams shall be cleaned out and filled with concrete or mortar. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02630 - <br />11 <br />Storm Drainage <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.