Laserfiche WebLink
SECTION 02919 <br /> <br />TOPSOIL <br /> <br /> <br />PART 1 GENERAL <br /> <br />1.01 SUMMARY <br /> <br />A. The work covered by this section consists of furnishing labor, equipment, and <br />material needed to provide finished grass ground cover by the placing and <br />spreading of top soil. <br /> <br />1.02 RELATED SECTIONS <br /> <br />A. Clearing and Grubbing - Division 2. <br /> <br />B. Mulching - Division 2. <br /> <br />C. Earthwork - Division 2. <br /> <br />D. Seeding and Soil Supplements - Division 2. <br /> <br />1.03 REFERENCES <br /> <br />A. Standards - Federal Specifications (FS) 0-F-241C. <br /> <br />B. Testing Agency - Independent testing laboratory. <br /> <br />C. Requirements of Regulating Agencies - Comply with requirements of the State <br />Department of Agriculture. <br /> <br />D. Cost of Testing - The testing is at expense of the CONTRACTOR. <br /> <br />1.04 SUBMITTALS <br /> <br />A. Test Report - Results of seed purity and germination tests. <br /> <br />B. Certificates - Manufacturer's certification that materials meet specification <br />requirements. <br /> <br />1.05 MEASUREMENT AND PAYMENT <br /> <br />A. Payment will be made at the unit price bid for top soil, which price and payment <br />shall constitute full compensation for furnishing materials and performing work in <br />connection therewith and incidental thereto. <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02919 - <br />1 <br />Topsoil <br />14-1758 / 09-19-2014 <br />