My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PART 2 PRODUCTS <br /> <br />2.01 WATER <br /> <br />A. Free or matter harmful to plant growth. <br /> <br />2.02 TOPSOIL <br /> <br />A. Material used for top soil shall be material supplied by CONTRACTOR from off-site <br />sources or from excavated pond bottom area if suitable for this use. <br /> <br />B. Topsoil mixture shall be suitable for plant growth and free from hard clods, stiff clay, <br />hardpan, gravel, brush, large roots, refuse or other deleterious material, and shall <br />be of reasonably uniform quality. <br /> <br />C. Rocks larger than 1 inch in diameter shall be removed. <br /> <br />D. Organic content as determined in accordance with AASHTOT 194 shall be at least <br />five percent (5%) and the pH shall be between 5.0 and 7.0. <br /> <br /> <br />PART 3 EXECUTION <br /> <br />3.01 CONDITIONS <br /> <br />A. Check that preceding work affecting ground surface is completed. <br /> <br />B. Do not start work until conditions are satisfactory. <br /> <br />3.02 PREPARATION <br /> <br />A. Stockpiled topsoil shall be spread to a thickness of two (2) inches over areas to be <br />seeded. <br /> <br />1. The resulting ground elevation shall be the proposed finished grade shown in <br />the Drawing. <br /> <br />B. Till fertilizer into top two (2) inches of soil at rate of 12 lbs/1000 sq. ft. <br /> <br />C. Water dry topsoil to depth of five (5) inches at least forty eight (48) hours prior to <br />seeding to obtain a loose friable seed bed. <br /> <br /> <br />END OF SECTION <br /> <br /> <br /> <br /> <br /> <br />02919 - 2 Topsoil <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />14-1758 / 09-19-2014 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.