Laserfiche WebLink
3.03 SOD ESTABLISHMENT <br /> <br />A. Watering: <br /> <br />1. Keep sod moist during first week after planting. <br /> <br />2. After first week, supplement rainfall to produce total of one (1) inch per day <br />until sod has acclimated. <br /> <br />B. Weed Eradication: maintain grass in a weed free condition until OWNER <br />acceptance. <br /> <br />C. Fertilizer: Apply fertilizer uniformly at manufacturer’s recommended rate, two <br />weeks after sod installation. <br /> <br />1. Fertilizer should be dispensed using light weight spreaders. <br /> <br />D. Maintenance period to extend until acceptance of the OWNER. <br /> <br />3.04 CLEANING <br /> <br />A. Immediately clean spills from paved and finished surface areas. <br /> <br />B. Remove debris and excess materials from project site. <br /> <br />3.05 FINAL INSPECTIONS <br /> <br />A. Project final payment approval determines OWNER acceptance. <br /> <br />B. Replace rejected sod areas with acceptable sod within two weeks after the <br />inspection. <br /> <br /> <br />END OF SECTION <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />02924 - 5 Sodding <br />14-1758 / 09-19-2014 <br />