My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1.04 MEASUREMENT AND PAYMENT <br /> <br />A. Measurement and payment will be included in the lump sum prices for the <br />appropriate work items, as shown in the Bid Schedule, as required for those <br />items which price and payment shall constitute full compensation for furnishing <br />materials and performing work in connection herewith and as specified in the <br />scope of work under this section. <br /> <br />1.05 TESTS AND CERTIFICATES <br /> <br />A. TESTS <br /> <br />1. Make tests in accordance with the recommendations of ASTM. <br /> <br />a. Do not exceed maximum concrete slumps as specified above. <br /> <br />b. Make five cylinders for each test required. <br /> <br />c. Take samples for the test from the mixer at the 1/4 and 3/4 points in the <br />load. <br /> <br />2. The ENGINEER may order core borings or other special tests during the <br />progress of the work. <br /> <br />3. Removed and replaced at no cost to the OWNER concrete failing indicated <br />tests. <br /> <br />4. CONTRACTOR to pay the cost of testing. <br /> <br />a. Propose a testing agency for approval by the ENGINEER. <br /> <br />B. SLUMP TESTS <br /> <br />1. Perform slump tests in accordance with ASTM C143 (latest edition) by <br />testing agency. <br /> <br />a. Make tests for each 10 cubic yards, or fraction thereof, of each pour. <br /> <br />b. In the event the slump exceeds the specified requirements, the batch <br />shall be rejected. <br /> <br /> C. AIR TESTS <br /> <br />1. Testing agency shall test the air content of the freshly mixed concrete in <br />accordance with ASTM C231 or C173 (latest edition) for each 10 cubic <br />yards, or fraction thereof, of each pour. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />03300 - 2 Cast-in-Place Concrete <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.