My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Metal hardware shall be type 18-8 stainless steel. <br /> <br />6. The seal shall be similar to the Link-Seal modular wall and casing seal <br />manufactured by Thunderline Corporation or the equivalent by other <br />manufacturers. <br /> <br />B. Select required inside diameter of each wall opening or sleeve for each pipe <br />and the correct sizing of seal. <br /> <br />2.11 UNIONS <br /> <br />A. For ductile iron, carbon steel, and gray cast iron pipes assembled with threaded <br />joints and malleable iron fittings, unions shall conform to ANSI 816.39. <br /> <br />B. For copper piping, unions shall have ground joints and conform to ANSI B16.18. <br /> <br />C. For PVC and CPVC piping, unions shall be socket weld type with Viton O-ring. <br /> <br />2.12 INSULATING TYPE FITTINGS <br /> <br />A. When joining two pipes of dissimilar materials, insulating type fittings shall be <br />used to prevent galvanic action. <br /> <br /> <br />PART 3 EXECUTION <br /> <br />3.01 EXAMINATION <br /> <br />A. Furnish labor, tools, materials, and equipment necessary for installation and <br />jointing of the pipe. <br /> <br />1. Piping shall be installed in accordance with the Drawings in a neat <br />workmanlike manner, and shall be set for accurate line and elevation. <br /> <br />2. Piping shall be thoroughly cleaned before installation, and care shall be <br />taken to keep the piping clean throughout the installation. <br /> <br />B. Before setting wall sleeves, pipes, castings, and pipes to be cast in place, check <br />Drawings, figures, and shop drawings, which may have a direct bearing on the <br />pipe locations. <br /> <br />1. Assume responsibility for the proper location of the pipes and <br />appurtenances during the construction of and renovation of the tanks and <br />structures. <br /> <br />C. Piping shall be attached to pumps, valves, or equipment in accordance with the <br />respective manufacturers' recommendations. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />15105 - 14 Pipes and Tubes <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.