My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Pipelines shall be flushed and tested in such lengths or sections as agreed <br />upon between the OWNER, ENGINEER, and CONTRACTOR. <br /> <br />5. Give the OWNER and ENGINEER reasonable notice of the time prior to <br />testing the pipeline. <br /> <br />6. The ENGINEER reserves the right, within reason, to request flushing and <br />testing of a section or portion of a pipeline. <br /> <br />7. For sewage force mains, unless otherwise specified, the minimum test <br />pressure shall be 150 psig. <br /> <br />B. Flushing <br /> <br />1. At the conclusion of the installation work, thoroughly clean new pipe by <br />flushing with water or other means to remove dirt, stones, and pieces of <br />wood, which may have entered the pipe during the construction period. <br /> <br />a. If after this cleaning should any obstructions remain, they shall be <br />corrected by the CONTRACTOR, at his own expense and to the <br />satisfaction of the ENGINEER. <br /> <br />b. Pipelines shall be flushed at a rate of at least 2.5 feet per second for a <br />duration suitable to the ENGINEER, but in no event less than 60 <br />minutes. <br /> <br /> C. Pressure Testing <br /> <br />1. After the pipe has been installed, joints completed, thrust blocks have been <br />in place for at least five days, and the trench has been partially backfilled <br />leaving the joints exposed for examination, the pipe shall be filled with water <br />in a manner to expel air. <br /> <br />a. The pipeline shall be subjected to a test pressure of 150 psig, as <br />measured at the low points of the pipe, for a period of at least two hours. <br /> <br />b. Each valve shall be opened and closed several times during the test. <br /> <br />c. The exposed pipe, joints, fittings, and valves shall be examined for leaks. <br /> <br />d. Visible leaks shall be stopped or the defective pipe, fitting, joints, or <br />valve(s) shall be replaced. <br /> <br />D. Leakage Testing <br /> <br />1. The leakage test may be conducted subsequent to or concurrently with the <br />pressure test. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />15105 - 29 Pipes and Tubes <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.