My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. Upon completion of a successful test, the ENGINEER and the <br />CONTRACTOR shall certify the test results. <br /> <br />11. Questions pertaining to procedures used during the test shall be answered <br />and decided by the ENGINEER. <br /> <br />12. Leaks or defective pipe disclosed by the hydrostatic test shall be corrected <br />by the CONTRACTOR at his own expense, and the test shall be repeated. <br /> <br />E. Allowable Leakage – DIP and PVC Pressure Piping <br /> <br />1. No installation will be accepted by the ENGINEER until the leakage is less <br />than the number of gallons per hour as determined by the formula: <br /> <br /> Q = (S)(D) (Square Root of P) <br /> 133,200 <br /> <br /> in which Q = allowable leakage in gallons per hour, S = total length of pipe <br />being tested in feet, D = diameter of pipe tested inches, and P = the average <br />test pressure during the leakage test in pounds per square inch. <br /> <br />2. When testing against closed metal-seated valves, an additional leakage per <br />closed valve of 0.0078 gal/hr/in of nominal valve size shall be allowed. <br /> <br />F. Allowable Leakage – HDPE Pressure Piping (Monitored Make-Up Water Test) <br /> <br />1. The testing procedure for HDPE pipe consists of initial expansion, and test <br />phase. During the initial expansion phase, the test section is pressurized to <br />the test pressure, and enough make-up water is added each hour for three <br />(3) hours to return to test pressure. <br /> <br />2. The test phase follows immediately, and may be two (2), or three (3) hours. <br />At the end of the test time, the test section is returned to test pressure by <br />adding a measured amount of water. If the amount of make-up water added <br />does not exceed the Table 1 values below, leakage is not indicated. <br /> <br />Table 1: Test Phase Make-Up Amount <br />Nominal <br />Pipe Size <br />(in.) <br />Make-Up Water Allowance <br />(U.S. Gallons/100 ft. of Pipe) <br />2-hour test 3-hour test <br />1½ 0.10 0.17 <br />2 0.11 0.19 <br />3 0.15 0.25 <br />4 0.25 0.40 <br />6 0.60 0.90 <br />8 1.00 1.50 <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />15105 - 31 Pipes and Tubes <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.