My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1. The Irrigation Contractor shall coordinate with U.N.C.L.E. (800-432-4770) and all other <br />Agencies as need to provide the service of locating and identifying the locations and <br />types of existing underground and overhead services that are existing on the site. <br /> <br />2. Review all other plans for work on site outside the buildings for coordination and <br />protection of the work proposed by others. <br /> <br />3. The Irrigation Contractor shall exercise care in digging and work so as not to <br />damage existing utilities. Should such overhead or underground utilities be encountered <br />which interfere with the work, the Owner or Owner's Agent shall be consulted <br />immediately. The sub-contractor shall be held responsible for the repair of any <br />damage caused by his work. <br /> <br />3.03 RESPONSIBILITY PRIOR TO FINAL ACCEPTANCE: <br /> <br />A. The sub-contractor shall be responsible for maintaining the system for a period of 1 year <br />after final Acceptance. The responsibilities include, but are not limited to, the following: <br /> <br />1. Repair of all damage to installed material and equipment. <br /> <br />2. Adjustment of all sprinkler heads with regard to height, arc coverage and radius. <br /> <br />3. Cleaning, repair and adjustment of all valves and other controls. <br /> <br />4. After testing, completion and adjustment of the system, the contractor will instruct the <br />maintenance personnel in the operation and maintenance of the system. <br /> <br />PART 4 - MEASUREMENT AND PAYMENT <br /> <br />A. MEASUREMENT <br /> <br />1. The irrigation system, as described by the irrigation plans, is measured as a single <br />system. <br /> <br />2. The irrigation pump station, as detailed in the irrigation plans, is measured as a single <br />system. <br /> <br />B. PAYMENT <br /> <br />1. The irrigation system is to be paid for as a lump sum item. Payment shall be for the <br />supply and installation of all necessary materials including pump station, heads, valves, <br />laterals, main, wires, trenching in order to provide a completely installed system. <br /> <br /> <br /> <br /> <br /> <br />END OF SECTION 328400 <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />328400 - 7 Irrigation <br />
The URL can be used to link to this page
Your browser does not support the video tag.