Laserfiche WebLink
<br />Responsibility for Connection to Existing Work: <br /> <br /> 6.36 It shall be the express responsibility of the CONTRACTOR to connect his <br />Work to each part of the existing work or work previously installed as required by <br />the Drawings and Specifications to provide a complete installation. <br /> <br />Work in Street, Highway and Other Rights-of-Way: <br /> <br /> 6.37 Excavation, grading, fill, storm drainage, paving and any other construction or <br />installations in rights-of-way of streets, highways, public carrier lines, utility lines <br />either aerial, surface or subsurface), etc., shall be done in accordance with <br />requirements of the special conditions. The OWNER will be responsible for <br />obtaining all permits necessary for the Work. Upon completion of the Work, the <br />CONTRACTOR shall present to the ENGINEER certificates, in triplicate, from the <br />proper authorities stating that the Work has been done in accordance with their <br />requirements. <br /> <br /> 6.37.1 The OWNER will cooperate with the CONTRACTOR in obtaining <br />action from any utilities or public authorities involved in the above <br />requirements. <br /> <br /> 6.37.2 The CONTRACTOR shall be responsible for obtaining elevations of <br />curbs and gutters, pavement, storm drainage structures, and other items as <br />soon as grading operations are begun on the site and, in any case, <br />sufficiently early in the construction period to prevent any adverse affect on <br />the Project. <br />Cooperation with Governmental Departments Public Utilities, Etc.: <br /> <br /> 6.38 The CONTRACTOR shall be responsible for making all necessary <br />arrangements with governmental departments, public utilities, public carriers, <br />service companies and corporations owning or controlling roadways, railways, <br />water, sewer, gas, electrical, telephone, and telegraph facilities such as <br />pavements, tracks, piping, wires, cables, conduits, poles, guys, etc., including <br />incidental structures connected therewith, that are encountered in the Work in <br />order that such items may be properly shored, supported and protected, or the <br />CONTRACTOR may relocate them if he so desires. The CONTRACTOR shall <br />give all proper notices, shall comply with requirements of such parties in the <br />performance of his Work, shall permit entrance of such parties on the project in <br />order that they may perform their necessary work, and shall pay all charges and <br />fees made by such parties for this Work. <br /> <br /> 6.38.1 The CONTRACTOR'S attention is called to the fact that there may <br />be delays on the Project due to Work to be done by governmental <br />departments, public utilities, and others in repairing or moving poles, <br />conduits, etc. The CONTRACTOR shall cooperate with the above parties <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />20 <br />General Conditions <br />14-1758 / 09-19-2014 <br />