My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />at the expense of the CONTRACTOR to a condition equal to that existing at the <br />time of award of Contract. <br /> <br />Explosives: <br /> <br /> 6.41 When the use of explosives is necessary in the prosecution of the Work, the <br />CONTRACTOR shall be charged with the utmost care in the handling and usage <br />of such explosives to the protection of life and property. When directed by the <br />ENGINEER, the number and size of charges shall be reduced. All explosives shall <br />be stored in a safe manner and storage places shall be clearly marked "Danger - <br />Explosives", and placed in the care of competent watchmen. When such use of <br />explosives becomes necessary, the CONTRACTOR shall furnish to the <br />ENGINEER competent proof of coverage adequately providing public liability and <br />property damage insurance, as a rider attached to his regular policies unless <br />otherwise included. <br /> <br />ARTICLE 7 - WORK BY OTHERS <br /> <br /> 7.1 The OWNER may perform additional work related to the Project by himself, or <br />he may let other direct contracts therefore which shall contain General Conditions <br />similar to these. <br /> <br /> The CONTRACTOR will afford the other contractors who are parties to such direct <br />contracts (or the OWNER, if he is performing the additional Work himself), <br />reasonable opportunity for the introduction and storage of materials and equipment <br />and the execution of Work, and shall properly connect and coordinate his Work <br />with theirs. <br /> <br /> 7.2 If any part of the CONTRACTOR'S Work depends for proper execution or <br />results upon the Work of any such other CONTRACTOR (or the OWNER), the <br />CONTRACTOR will promptly report to the ENGINEER in writing any defects or <br />deficiencies in such Work that render it unsuitable for such proper execution and <br />results. <br /> <br /> 7.3 The CONTRACTOR will do all cutting, fitting and patching of his Work that <br />may be required to make its several parts come together properly and fit it to <br />receive or be received by such other work. The CONTRACTOR will not endanger <br />any work of others by cutting, excavating or otherwise altering their work and will <br />only cut or alter their work with the written consent of the ENGINEER and of the <br />other Contractors whose work will be affected. <br /> <br /> 7.4 If the performance of additional work by other contractors or the OWNER is <br />not noted in the Contract Documents prior to the execution of the Contract, written <br />notice thereof shall be given to the CONTRACTOR prior to starting any such <br />additional work. If the CONTRACTOR believes that the performance of such <br />additional work by the OWNER or others involves him in additional expense or <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />22 <br />General Conditions <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.