My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the supporting data, that the Work has progressed to the point indicated; that, to <br />the best of his knowledge, information and belief, the quality of the Work is in <br />accordance with the Contract Documents (subject to an evaluation of the Work as <br />a functioning Project upon substantial completion, to the results of any subsequent <br />tests called for in the Contract Documents and any qualifications stated in his <br />approval); and that the CONTRACTOR is entitled to payment of the amount <br />approved. However, by approving any such payment the ENGINEER shall not <br />thereby be deemed to have represented that he made exhaustive or continuous <br />on-site observations to check the quality or the quantity of the Work, or that he has <br />reviewed the means, methods, techniques, sequences and procedures of <br />construction or that he has made any examination to ascertain how or for what <br />purpose the CONTRACTOR has used the moneys paid or to be paid to him on <br />account of the Contract Price, or that title to any Work, materials, or equipment has <br />passed to the OWNER free and clear of any liens. <br /> <br />Certification on Request: <br /> <br /> 14.6 The CONTRACTOR shall make the following certification on each request <br />for payment: "I hereby certify that the labor and materials listed on this request for <br />payment have been used in the construction of this work or that all materials <br />included in this request for payment and not yet incorporated into the construction <br />fare now on the site or stored at an approved location; and payment received from <br />the last request for payment has been used to make payments to all first tier <br />subcontractors and suppliers except as listed below". <br /> <br />Final Payment: <br /> <br /> 14.7 The ENGINEER'S approval of final payment shall constitute an additional <br />representation by him to the OWNER that the conditions precedent to the <br />CONTRACTOR'S being entitled to final payment as set forth in paragraph 14.13 <br />have been fulfilled. <br /> <br />Refusal to Pay: <br /> <br /> 14.8 The ENGINEER may refuse to approve the whole or any part of any <br />payment if, in his opinion, he is unable to make such representations to the <br />OWNER. He may also refuse to approve any such payment, or because of <br />subsequently discovered evidence or the results of subsequent inspection or tests, <br />nullify any such payment previously approved, to such extent as may be necessary <br />in his opinion to protect the OWNER from loss because: <br /> <br /> 14.8.1 The Work is defective, or completed Work has been damaged <br />requiring correction or replacement, <br /> <br /> 14.8.2 The Work for which payment is requested cannot be verified, <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />37 <br />General Conditions <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.