My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 14.8.3 Claims or Liens have been filed or there is reasonable evidence <br />indicating the probable filing thereof, <br /> <br /> 14.8.4 The Contract Price has been reduced because of modifications, <br /> <br /> 14.8.5 The OWNER has been required to correct defective Work or <br />complete the Work in accordance with Article 13. <br /> <br /> 14.8.6 Of unsatisfactory prosecution of the Work, including failure to clean <br />up as required by paragraphs 6.29 and 6.30, <br /> <br /> 14.8.7 Of persistent failure to cooperate with other contractors on the <br />Project and persistent failure to carry out the Work in accordance with the <br />Contract Documents, <br /> <br /> 14.8.8 Of liquidated damages payable by the CONTRACTOR, or <br /> <br /> 14.8.9 Of any other violation of, or failure to comply with, the provisions of <br />the Contract Documents. <br /> <br />Substantial Completion: <br /> <br /> 14.9 Prior to Substantial Completion, the OWNER, with the approval of the <br />ENGINEER and with the concurrence of the CONTRACTOR, may use any <br />completed or substantially completed portions of the Work. Such use shall not <br />constitute an acceptance of such portions of the Work. <br /> <br />Entering Premises: <br /> <br /> 14.10 The OWNER shall have the right to enter the premises for the purpose of <br />doing work not covered by the Contract Documents. This provision shall not be <br />construed as relieving the CONTRACTOR of the sole responsibility for the care <br />and protection of the Work, or the restoration of any damaged Work except such <br />as may be caused by agents or employees of the OWNER. <br /> <br />Engineer’s Certificate: <br /> <br /> 14.11 Upon completion and acceptance of the Work the ENGINEER shall issue a <br />certificate attached to the final payment request that the Work has been accepted <br />by him under the conditions of the Contract Documents. The entire balance found <br />to be due the CONTRACTOR, including the retained percentages, but except such <br />sums as may be lawfully retained by the OWNER, shall be paid to the <br />CONTRACTOR within thirty (30) days of completion and acceptance of the Work. <br /> <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00700- <br />38 <br />General Conditions <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.