Laserfiche WebLink
<br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />00800-8 Special Conditions and <br />Supplementary Conditions <br />14-1758 / 09-19-2014 <br /> <br /> <br /> The ENGINEER and the CITY reserve the right to require the <br />CONTRACTOR to work twenty-four (24) hours per day in all cases where <br />interference with existing water and sewer service may result in health <br />hazards, offensive conditions or serious inconveniences to persons served <br />by the system. <br /> <br /> E. Conflicts and Conflict Manholes/Inlets - The CONTRACTOR shall abide <br />by the following schedule of criteria concerning conflicts with other <br />contractors and other utilities. <br /> <br /> (1) The CONTRACTOR shall verify the location of each utility line <br />suspected of conflict prior to ordering the structure involved in the <br />conflict and make it known to the OWNER and ENGINEER of any <br />adjustment required for the structures. <br /> <br /> (2) In no case shall there be less than the standard minimum vertical <br />and horizontal separation between utilities and structures unless <br />otherwise allowed by the utility owner. <br /> <br /> (3) In cases of unforeseen utility conflicts the CONTRACTOR may be <br />required to build conflict structures in place to avoid time delays. <br /> <br /> (4) The ENGINEER shall have full authority to direct the placement <br />of the various pipes and structures in order to facilitate <br />construction, expedite completion and avoid conflicts. <br /> <br /> (5) Where an existing utility is to go through a conflict manhole/inlet, <br />the manhole/inlet shall have a steel sleeve completely through the <br />structure to protect the utility from breakage due to possible <br />structure settlement. The steel sleeve shall meet the requirement <br />of ASTM and the utility owner. <br /> <br />F. Adjust Existing Valves, Meters, Catch Basins and Manholes - It shall be the <br />CONTRACTOR's responsibility to make all adjustments to existing water <br />meters, valves, catch basins and manholes encountered during construction, in <br />order to meet all final grades, unless otherwise instructed by the ENGINEER or <br />the respective utility owner. Omission of such structures from the CONTRACT <br />Plans does not relieve the CONTRACTOR from making such adjustments as <br />may be deemed necessary. The CONTRACTOR shall take this provision into <br />account when personally investigating the site prior to bidding. Payment for <br />such adjustments shall be included in the unit prices for various contract items. <br />The CONTRACTOR shall pay the cost of all utility adjustments and all related <br />tests. The CITY will not pay this cost. <br /> <br /> <br />