My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01291 <br /> <br />SCHEDULE OF VALUES <br /> <br /> <br />PART 1 GENERAL <br /> <br />1.01 SUMMARY <br /> <br />A. Submit to the OWNER and ENGINEER a Schedule of Values allocated to the <br />various portions of the Work, within fifteen (15) work days after Notice of Award. <br /> <br />B. Upon request of the OWNER and/or ENGINEER, support the values with data <br />which will substantiate their correctness. <br /> <br />C. The Schedule of Values shall be used as the basis for the CONTRACTOR's <br />Applications for Payment. <br /> <br />1.02 RELATED REQUIREMENTS <br /> <br />A. Conditions of the Contract - Division 0. <br /> <br />B. Applications and Certification for Payment - Division 1. <br /> <br />1.03 FORM AND CONTENT OF SCHEDULE OF VALUES <br /> <br />A. Type schedule on an 8-1/2 inches by 11 inches or 8-1/2 inches by 14 inches <br />white paper; CONTRACTOR's standard forms and automated printout will be <br />considered for approval by the ENGINEER upon CONTRACTOR's request. <br /> <br />B. Identify schedule with: <br /> <br />1. Title of Project and location <br /> <br />2. ENGINEER and Project number <br /> <br />3. Name and Address of CONTRACTOR <br /> <br />4. Contract designation <br /> <br />5. Date of submission <br /> <br />C. Schedule shall list the installed value of the component parts to include <br />excavation, piping, paving, of the Work (as required) in sufficient detail to serve <br />as a basis for computing values for progress payments during construction. <br /> <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01291 - 1 Schedule of Values <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.