Laserfiche WebLink
D. For the various portions of the Work: <br /> <br />1. Each item shall include a directly proportional amount of the <br />CONTRACTOR's overhead and profit. <br /> <br />E. The sum of values listed in the schedule shall equal the total Contract Sum. <br /> <br />F. Schedules are subject to ENGINEER's approval wherein additional line item <br />detail may be required. <br /> <br />G. Submit current revision of the Schedule of Values with Application for Payment. <br /> <br /> <br />PART 2 PRODUCTS (Not Used) <br /> <br /> <br />PART 3 PRODUCTS (Not Used) <br /> <br /> <br />END OF SECTION <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01291 - 2 Schedule of Values <br />14-1758 / 09-19-2014 <br />