My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:14:46 PM
Creation date
6/14/2017 4:04:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. Show projected dollar cash flow requirements for each month of <br />construction. <br /> <br />B. Submittals Schedule for Shop Drawings, and Samples in accordance Division 1. <br /> <br />1. Show: <br /> <br />a. The dates for CONTRACTOR’s submittals. <br /> <br />b. The dates submittals will be required for OWNER furnished products, if <br />applicable. <br /> <br />c. The dates approved submittals will be required from the ENGINEER. <br /> <br />C. Provide a list of long lead items (equipment and materials). <br /> <br />1.05 PROGRESS REVISIONS <br /> <br />A. Indicate progress of each activity to date of submission. <br /> <br />B. Show changes occurring since previous submission of schedule: <br /> <br />1. Major changes in scope. <br /> <br />2. Activities modified since previous submission. <br /> <br />3. Revised projections of progress and completion. <br /> <br />4. Other identifiable changes. <br /> <br />C. Provide a narrative report as needed to define: <br /> <br />1. Problem area, anticipated delays, and the impact on the schedule. <br /> <br />2. Corrective action recommended, and its effect. <br /> <br />3. The effect of changes on schedules of other prime CONTRACTORs. <br /> <br />1.06 SUBMISSIONS <br /> <br />A. Submit initial schedules to the OWNER and ENGINEER within fifteen (15) <br />days after the effective date of the Agreement. <br /> <br />1. The OWNER and ENGINEER will review schedules and return review <br />copy within ten (10) days after receipt. <br /> <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01327 - 3 Scheduling of Construction <br />14-1758 / 09-19-2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.