<br />3. Scale and spacing: To allow space for notations and future revisions. <br /> <br />4. Minimum sheet size: 11 inches x 17 inches. <br /> <br />B. Format of listings: The chronological order of the start of each item of work. <br /> <br />C. Identification of listings: By major specification section numbers as applicable <br />and structure. <br /> <br />D. Illustrate the expected progress payment for each month. <br /> <br />1.04 CONTENT OF SCHEDULES <br /> <br />A. Construction Progress Schedule: <br /> <br />1. Show the complete sequence of construction by activity. <br /> <br />2. Show the dates for the beginning of, and completion of, each major element <br />of construction in no more than a two week increment scale. <br /> <br />3. At a minimum, Specifically list: <br /> <br />a. Site Clearing <br /> <br />b. Demucking <br /> <br />c. Excavation <br /> <br />d. Pipeline Work <br /> <br />e. Structure Construction <br /> <br />f. Electrical Construction <br /> <br />g. Mechanical Construction <br /> <br />h. Testing <br /> <br />i. Start-up <br /> <br />j. Restoration <br /> <br />k. As-built Drawings <br /> <br />4. Show projected percentage of completion for each item, as of the first of <br />each month. <br /> <br />City of Sunny Isles Beach <br />NE 174th Street Roadway Improvements <br />01327 - 2 Scheduling of Construction <br />14-1758 / 09-19-2014 <br />