My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Add No 3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
Add No 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 4:17:32 PM
Creation date
6/14/2017 4:15:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum No. 3 ‐ Bidder Questions and Responses <br />NE 174TH STREET ROADWAY IMPROVEMENTS <br />CITY RFP NO. 14‐11‐01 <br /> <br /> <br /> <br />3 <br /> <br /> <br />26+00 approx.). The existing shelters needs to be removed and salvaged to the City? <br />Please advise. <br /> <br />Response: Installation of bus shelters does mean furnish and install. The Contractor shall <br />be responsible for coordinating with the Bus shelter provider for provision of any and all <br />engineering services required for installation of the proposed shelters. Existing benches <br />and trash bins are to be protected and reinstalled. All shelters removed from within the <br />project area shall be hauled away by the successful Contractor to the City’s Public Works <br />facility located beneath the William Lehman Causeway. <br /> <br /> <br />11. Under Section 5 Qualifications, it references proposer’s relevant experience. Should <br />experience in coastal projects be a requirement to qualify? <br /> <br />Response: It is not a requirement. However, such experience would be looked upon as a <br />plus though it will not be the determining factor. <br /> <br /> <br /> Please be advised that Civil plan sheets C‐14 to C‐16 and C‐30 have been revised. <br /> <br /> RER permit Number CLII‐20140027 for the project has been included herein. <br /> <br /> Landscape and Irrigation Plan sheets have been revised and are included as part of this RFC for <br />contractor reference. <br /> <br /> A revised bid form has been provided. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.